Eligibility
Small residential rooftop solar energy systems on existing buildings may be eligible for streamlined approval and inspection if they meet all the following requirements:
Streamlined Permit Application Process
Applications for streamlined solar permit processing may be submitted online or at the Building and Planning counter at City Hall. Download the Application Checklist to make sure you include all the required documentation with your permit application.
Applications will be reviewed within 3 business days. If an application is incomplete, a correction notice will be issued. If an application is ineligible for streamlining, project review will move forward under standard (non-streamlined) Department procedure. If the application is complete and meets the eligibility criteria, a building permit will be issued.
On-Site Inspection Required
After a permit has been issued and the system is installed, an on-site inspection is required to ensure compliance with all health and safety codes. Inspection requests may be made by phone at (415) 508-2120 or by emailing the Building Department. Inspections will be scheduled within 5 business days of the inspection request. Once you have scheduled your inspection, use the inspection checklists below to prepare for your inspection. If you do not pass the first inspection, a correction notice will be issued and the standard (non-streamlined) inspection process will move forward.
Streamlining Application Documents and Resources