3.
Revisions
to
the
Text
of
the
Draft
EIR
If
the
stop
work
threshold
is
exceeded,
evaluate
the
condition
of
the
building
for
damage.
If
no
damage
is
indicated
consult
with
structural
engineer
and/or
architectural
historian
to
assess
whether
higher
thresholds
are
possible
and
adjust
as
appropriate.
If
damage
occurs
determine
if
any
other
construction
approaches
are
feasible
to
reduce
vibration.
If
none
is
available
examine
the
severity
of
the
damage
to
determine
if
damage
is
minor
and
repair
is
feasible.
If
repair
is
feasible
continue
with
construction,
but
monitor
vibration
and
damage
closely
to
ensure
that
damage
remains
repairable.
Consider
whether
a
lower
stop
work
threshold
is
feasible.
If
damage
approaches
becoming
unrepairable
and
vibration
levels
have
approached
or
exceeded
the
stop
work
threshold
repeatedly,
reconsider
construction
of
the
project.
Repair
any
damage
that
has
occurred.
Page
4.J-26
OSEC-404
[See
page
5-360
for
the
original
comment],
SFPUC-4
[See
page
5-
77
for
the
original
comment]
ADD
the
following
Mitigation
Measure
4.J-2c
after
Mitigation
Measure
4.J-2b:
Mitigation
Measure
4.J-2c:
All
development
sites
requiring
pile
driving
shall
have
underground
utility
5
surveys
completed
before
a
building
permit
is
issued
to
demonstrate
that
pile
driving
will
be
located
a
minimum
15
feet
from
buried
utilities.
Underground
utilities
surveys
shall
be
submitted
to
the
City
for
review
and
consultation
with
affected
utilities
a
minimum
of
two
weeks
prior
to
commencement
of
construction
activities.
If
underground
utilities
are
identified
within
15
feet
of
proposed
pile
driving
activities,
alternative
pile
installation
methods
shall
be
required.
Alternative
methods
may
include
use
of
sonic
drivers
or
drilled
and
cast-in-
place
piles.
All
pile
driving
shall
be
designed
so
as
to
result
in
peak
particle
velocity
of
less
than
4.0
in/sec
(100
mm/s)
at
the
location
of
underground
utilities.
Within
one
week
following
completion
of
pile
driving
activities,
a
post-
construction
assessment
of
all
underground
utilities
within
30
feet
of
the
pile
driving
activity
shall
be
submitted
to
the
City
by
the
contractor,
confirming
that
no
damage
to
any
underground
utilities
occurred
as
the
result
of
the
pile
driving
activity.
Should
the
post-construction
assessment
determine
that
underground
utilities
were
damaged
by
pile
driving
activities,
such
damage
shall
be
repaired
by
the
contractor
to
the
satisfaction
of
the
City
and
affected
utility.
5
Underground
utilities
include
electrical
lines,
irrigation
lines,
reclaimed
water
lines,
municipal
water
lines,
sewer
lines,
gravity
flow
facilities
(storm,
sanitary
and
laterals),
cable/communication
lines
and
gas
lines.
Brisbane
Baylands
Final
EIR
3-102