2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
As
described
in
Response
lifecycle
emissions
analyses
are
not
required
under
CEQA.
The
exact
types
of
solar
technology
to
be
installed
as
part
of
Project
site
development
and
the
sources
of
the
solar
technology
materials
have
not
yet
been
defined
and
could
not
be
known
during
preparation
of
the
Draft
EIR.
In
addition,
materials
may
be
manufactured
in
response
to
market
demand
may
change
over
time,
and
different
manufacturers
may
use
different
processes
and
materials
or
change
processes
and
materials
over
time.
Quantification
of
lifecycle
emissions
of
the
solar
technology
would
thus
be
speculative,
and
was
not
undertaken
for
the
Draft
EIR.
See
Groundborne
vibrations
generated
during
construction
are
addressed
in
Section
4.J,
Noise
and
Vibration
.
The
2004
American
Association
of
State
Highway
and
Transportation
Officials
(AASHTO)
guidelines
include
references
for
underground
utility
criteria,
citing
studies
indicating
that
vibration
under
the
ground
surface
is
lower
than
that
measured
at
the
ground
surface.
The
Caltrans
measure
of
the
threshold
of
architectural
damage
for
conventional
sensitive
structures
is
0.5
in/sec
PPV
for
new
residential
structures
and
modern
commercial
buildings
and
0.25
in/sec
PPV
for
historic
and
older
buildings
was
used
in
analyzing
vibration
impacts.
Underground
or
restrained
concrete
structures
can
withstand
vibration
of
10.0
in/sec
(254
mm/s)
before
the
appearance
of
threshold
cracks.
Thus,
underground
utilities
are
less
sensitive
than
surface
structures.
As
discussed
on
Draft
EIR
page
4.J-22,
pile
driving
can
result
in
peak
particle
velocity
(PPV)
of
up
to
1.5
in/sec
at
a
distance
of
25
feet
(FTA,
2006),
but
typically
average
about
0.644
PPV
at
that
distance.
All
other
construction
activities
would
have
substantially
lower
vibration
inducing
potential.
Vibration
from
pile
driving
could
potentially
reach
levels
in
excess
of
the
4.0
in/sec
AASHTO
criteria
at
distances
between
10
to
15
feet.
Thus,
pile
driving
within
10-15
feet
of
an
underground
pipeline
could
cause
damage
to
the
pipeline,
resulting
in
a
significant
impact.
Consequently,
Mitigation
Measure
4.J-2c
is
hereby
added
to
the
Draft
EIR:
Mitigation
Measure
4.J-2c:
All
development
sites
requiring
pile
driving
shall
have
underground
utility
7
surveys
completed
before
a
building
permit
is
issued
to
demonstrate
that
pile
driving
will
be
located
a
minimum
15
feet
from
buried
utilities.
Underground
utilities
surveys
7
Underground
utilities
include
electrical
lines,
irrigation
lines,
reclaimed
water
lines,
municipal
water
lines,
sewer
lines,
gravity
flow
facilities
(storm,
sanitary
and
laterals),
cable/communication
lines
and
gas
lines.
Brisbane
Baylands
Final
EIR
2.9.3-125
May
2015