Management).
AJso,
as
per
the
terms
of
the
existing
Joint
Exercise
of
Powers
Agreement,
the
project
sponsor
would
be
responsible
for
payment
of
applicable
capacity
charges.
SFPUC
Comment
WW-2
In
the
SFPUC'
s
comment
letter
on
the
NOP
dated
January
14,
2011,
we
requested
that
the
EIR
evaluate
impacts
of
additional
wastewater
and
stormwater
flows
on
our
sewer
system.
The
EIR
discusses
the
treatment
capacity
of
the
Southeast
Pollution
Control
Plane
in
relation
to
the
project'
s
additional
dry
weather
sanitary
flows,
but
does
not
discuss
potential
impacts
on
SFPUC'
s
collection
system,
including
impacts
from
stormwater
flows
from
the
portion
of
the
project
site
that
drains
into
the
SFPUC's
sewer
system
(DEIR
Page
40-18),
which
may
result
in
flooding
and
combined
sewer
overflow
discharge
events,
and
compliance
issues
with
the
SFPUC's
NPDES
permit.
To
determine
whether
the
project
would
affect
our
collection
capacity,
hydraulic
modeling
would
need
to
be
performed
in
conformance
with
SFPUC
standards.
Please
contact
Kent
Eickman,
SFPUC
Wastewater
Enterprise,
at
(415)
298-
9071
regarding
hydraulic
modeling
and
other
requirements.
Comment
WW-3
The
DEIR
does
not
discuss
potential
impacts
from
construction
activities
to
the
SFPUC's
infrastructure.
Potential
impacts
of
construction
activities,
including
vibration
effects
(from
activities
such
as
pile
driving,
compaction,
and
excavation)
on
SFPUC
infrastructure
with
in
the
project's
area
of
influence
should
be
analyzed.
If
additional
analysis
identifies
any
potential
impacts
on
SFPUC
infrastructure,
we
recommend
that
the
mitigation
measures
be
developed
in
coordination
wilh
SFPUC
and
include
preparatioo
and
implementation
of
a
vibration
monitoring
plan
and
a
pre-
and
post-project
condition
assessment
of
SFPUC
infrastructure.
These
plans
should
identify
affected
infrastructure,
protection
measures,
and
methods
to
video,
inspect,
and
test
this
infrastrucn1re
to
ensure
that
it
bas
been
adequately
protected
during
construction.
Comment
WW-4
The
DEIR
describes
a
recycled
water
facility
that
would
remove
most
of
the
liquid
waste,
but
does
not
discuss
potential
impact
of
the
recycled
water
facility
on
SFPUC's
wastewater
collection
system,
especially
with
respect
to
impacts
on
hydrauLics.
In
addition
to
fully
describing
all
the
impacts
of
this
facility,
development
of
the
recycled
water
facility
would
require
consultation
and
approval
from
the
SFPUC
as
it
would
bave
a
direct
impact
on
our
sewer
system.
Water
Supply
Following
are
SFPUC
comments
related
to
water
supply.
The
main
concern
from
the
SFPUC's
Water
Enterprise
is
that
an
BIR
be
prepared,
circulated
and
certified
at
some
time
that
adequately
describes
the
project's
proposed
water
supply
and
associated
potential
environmental
effects
and
recommends
feasible
measures
to
avoid
or
reduce
those
potential
adverse
effects.
The
SFPUC
would
expect
to
rely
upoo
such
an
EIR
to
adequately
describe
its
role
in
implementing
the
project's
proposed
water
supply,
including
changes
in
SFPUC
diversions,
storage
or
other
operations,
and
address
enviroumental
effects
from
a
proposed
water
supply
transfer
in
order
to
enter
an
agreement
or
agreements
to
implement
the
water
supply.
The
SFPUC
would
5-77