2.
Response
to
Comments
2.8
Individual
Responses
to
Comments
from
Municipalities
overflow
discharge
events
compared
with
current
conditions.
Please
see
pages
4.H-26
through
4.H-35,
and
4.O-51
to
4.O-52,
for
additional
information
on
proposed
stormwater
drainage
system
improvements,
as
well
as
Appendix
B,
Brisbane
Baylands
Infrastructure
Plan
for
information
specific
to
the
DSP
and
DSP-V
scenarios.
The
2004
American
Association
of
State
Highway
and
Transportation
Officials
(AASHTO)
guidelines
include
references
for
underground
utility
criteria,
citing
studies
that
indicate
vibration
under
the
ground
surface
is
lower
than
that
measured
at
the
ground
surface.
One
major
utility
(AASHTO
2004)
has
adopted
a
criterion
of
4.0
in/sec
(100
mm/s)
for
underground
optical-fiber
cables.
Underground
or
restrained
concrete
structures
can
withstand
vibration
of
10.0
in/sec
(254
mm/s)
before
the
appearance
of
threshold
cracks.
Thus,
underground
utilities
are
less
sensitive
than
surface
structures.
As
discussed
on
Draft
EIR
page
4.J-22,
pile
driving
can
result
in
peak
particle
velocity
(PPV)
of
up
to
1.5
in/sec
at
a
distance
of
25
feet
(FTA,
2006),
but
typically
average
about
0.644
PPV
at
that
distance.
All
other
construction
activities
would
have
substantially
lower
vibration
inducing
potential.
Vibration
from
pile
driving
could
potentially
reach
levels
in
excess
of
the
4.0
in/sec
AASHTO
criteria
at
distances
between
10
to
15
feet.
Consequently
additional
mitigation
measures
are
identified
to
implement
alternatives
to
impact
pile
driving,
as
needed.
These
alternative
methods
produce
substantially
less
vibration
than
pile
driving,
with
drilling
feasible
of
being
conducted
within
two
feet
of
utilities
and
complying
with
the
most
stringent
threshold.
Mitigation
Measure
4.J-2c
is
added
to
the
Draft
EIR
to
read
as
follows:
Mitigation
Measure
4.J-2c:
All
development
sites
requiring
pile
driving
shall
have
underground
utility
1
surveys
completed
before
a
building
permit
is
issued
to
demonstrate
that
pile
driving
will
be
located
a
minimum
15
feet
from
buried
utilities.
Underground
utilities
surveys
shall
be
submitted
to
the
City
for
review
and
consultation
with
affected
utilities
a
minimum
of
two
weeks
prior
to
commencement
of
construction
activities.
If
underground
utilities
are
identified
within
15
feet
of
proposed
pile
driving
activities,
alternative
pile
installation
methods
shall
be
required.
Alternative
methods
may
include
use
of
sonic
drivers
or
drilled
and
cast-in-place
piles.
All
pile
driving
shall
be
designed
so
as
to
result
in
peak
particle
velocity
of
less
than
4.0
in/sec
(100
mm/s)
at
the
location
of
underground
utilities.
1
Underground
utilities
include
electrical
lines,
irrigation
lines,
reclaimed
water
lines,
municipal
water
lines,
sewer
lines,
gravity
flow
facilities
(storm,
sanitary
and
laterals),
cable/communication
lines
and
gas
lines.
Brisbane
Baylands
Final
EIR
2.8.3-26
May
2015