3.
Revisions
to
the
Text
of
the
Draft
EIR
Page
4.J-25
BCC-433
and
BCC-435
[See
page
5-247
for
the
original
comment]
REVISE
Mitigation
Measure
4.J-2b
as
follows:
Mitigation
Measure
4.J-2b:
Pre-Construction
Assessment
to
Minimize
Structural
Pile-Driving
Vibration
Impacts
on
Adjacent
Historic
Buildings
and
Structures
and
Vibration
Monitoring.
Any
development
within
85
feet
of
the
Roundhouse
and
the
Machinery
&
Equipment
Building
that
would
require
pile
driving
or
other
construction
techniques
that
could
result
in
vibrations
of
0.25
in/sec
shall
engage
a
qualified
geotechnical
engineer
subject
to
City
approval
to
conduct
a
pre-construction
assessment
of
existing
subsurface
conditions
and
the
structural
integrity
of
the
nearby
historic
structures
subject
to
pile-driving
or
other
vibration-inducing
activity
before
a
building
permit
is
issued
to
demonstrate
that
the
proposed
construction
activities
would
not
result
in
vibration-induced
damage
to
the
Roundhouse
building
or
the
Machinery
&
Equipment
Building.
If
recommended
by
the
pre-construction
assessment,
groundborne
vibration
monitoring
of
nearby
historic
structures
shall
be
required.
Such
methods
and
technologies
shall
be
based
on
the
specific
conditions
at
the
construction
site
such
as,
but
not
limited
to,
the
pre-construction
surveying
of
potentially
affected
historic
structures
and
underpinning
of
foundations
of
potentially
affected
structures,
as
necessary.
The
pre-construction
assessment
shall
include
a
monitoring
program
to
detect
ground
settlement
or
lateral
movement
of
structures
in
the
vicinity
of
pile-driving
activities.
Monitoring
shall
be
maintained
while
construction
occurs
within
85
feet
of
historic
structures,
and
results
shall
be
submitted
to
the
City
Engineer.
In
the
event
of
unacceptable
ground
with
the
potential
to
cause
structural
damage
movement
(in
excess
of
0.25
in/sec
PPV
at
historic
structures),
as
determined
by
the
City
Engineer,
all
impact
work
shall
cease
until
corrective
measures
(e.g.,
installation
of
vibration
wave
barriers)
are
implemented
to
reduce
ground
movement
to
below
0.25
inches
PPV.
In
addition,
the
following
measure
shall
be
implemented:
Evaluate
and
implement
feasible
measures
for
reducing
vibration,
such
as
alternative
pile
driving
methods
(e.g.,
cast
‐
in
‐
drilled
‐
hole
piles
versus
driven
piles),
alternative
foundation
types
for
the
new
construction
(e.g.,
spread
footings
versus
driven
piles),
alternative
compaction
methods,
and
physical
measures
(intervening
trench,
increased
distance).
Require
monitoring
to
be
conducted
at
the
building
during
construction.
This
monitoring
can
include
crack
gages
on
existing
cracks
and
vibration
amplitude
monitoring.
Establish
warning
and
stop
work
thresholds
for
monitoring.
Implement
visual
and
audible
signals
that
are
triggered
by
a
vibration
monitor
when
exceedances
of
warning
and
stop
work
thresholds
occur.
If
warning
thresholds
are
exceeded
routinely,
consider
alternative
construction
approaches.
Brisbane
Baylands
Final
EIR
3-101
May
2015