3.
Revisions
to
the
Text
of
the
Draft
EIR
be
able
to
make
the
necessary
findings
required
for
abandonment
of
Beatty
Avenue
prior
to
the
completion
of
Geneva
Avenue
extension.
Page
4.N-110
[See
page
for
the
original
comment]
REVISE
the
second
paragraph
as
follows:
As
shown
in
those
tables,
among
the
intersections
analyzed
in
this
document,
the
following
four
would
operate
acceptably
under
Cumulative
With
Project
conditions
during
both
AM
and
PM
peak
hour,
and
the
cumulative
impact
would
be
less
than
significant:
2.
3.
10.
13.
19.
Guadalupe
Canyon
Parkway
&
Bayshore
Boulevard
Valley
Drive
&
Bayshore
Boulevard
Harney
Way
&
Thomas
Mellon
Drive
Blanken
Avenue
&
Tunnel
Avenue
Tunnel
Avenue
&
Geneva
Avenue
Page
4.N-115
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-3a
as
follows:
Mitigation
Measure
4.N-3a:
7
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
other
than
improvement
or
relocation
of
an
existing
use
within
the
Project
Site,
In
addition
to
the
improvements
required
by
Mitigation
Measure
4.N-1a
(which
addressed
Existing
Plus
Project
conditions)
shall
be
supplemented
the
following
physical
improvements
shall
be
constructed
and
accepted
for
public
maintenance
to
account
for
cumulative
traffic
conditions
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
Thus,
the
full
extent
of
improvements
shall
include
the
following:
The
eastbound
approach
at
the
signalized
intersection
of
Geneva
Avenue
&
Bayshore
Boulevard
shall
be
restriped
to
create
one
additional
through
lane
and
to
modify
one
of
the
existing
two
right-turn
lanes
to
become
a
shared
through/right-turn
lane.
In
addition,
the
southbound
approach
shall
be
restriped
to
provide
an
additional
exclusive
left-turn
pocket.
Finally,
the
northbound
approach
shall
be
restriped
to
provide
two
additional
lanes:
an
additional
left-turn
pocket
and
an
added
right-turn
lane.
7
Mitigation
Measure
4.N-1a
provides
for
mitigation
of
Project
Site
development-related
impacts
in
the
Existing
plus
Project
condition,
while
this
mitigation
measure
provides
for
mitigation
in
the
Cumulative
With
Project
condition.
This
mitigation
measure
is
based
on
needed
modification
to
the
existing,
baseline
configuration
of
the
intersection
and
does
not
assume
that
Mitigation
Measure
4.N-1a
is
implemented.
Brisbane
Baylands
Final
EIR
3-130
May
2015