3.
Revisions
to
the
Text
of
the
Draft
EIR
As
a
condition
of
approval
for
the
first
discretionary
action
taken
for
development
within
the
Project
Site,
the
applicant
shall
be
required
to
initiate
a
corridor
plan
for
Bayshore
Boulevard
in
cooperation
with
Daly
City
and
San
Francisco
to
determine
the
suite
of
improvements
necessary
to
resolve
long-term
cumulative
traffic
issues
along
the
corridor.
Because
the
effectiveness
of
such
a
corridor
plan
would
necessitate
participation
by
Daly
City
and
San
Francisco
in
recognition
of
increases
in
traffic
along
the
Bayshore
corridor
that
will
be
generated
by
future
development
within
those
two
jurisdictions,
Brisbane
will
also
make
its
best
efforts
to
assist
the
developer
in
securing
the
agreement
of
Daly
City
and
San
Francisco
to
participate
in
the
corridor
study
and
its
implementation.
Page
4.N-117
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-3b
as
follows:
Mitigation
Measure
4.N-3b:
8
At
the
signalized
intersection
of
Old
County
Road
&
Bayshore
Boulevard,
9
the
eastbound
approach
shall
be
restriped
to
create
one
additional
exclusive
through
lane.
In
addition,
the
southbound
approach
shall
be
restriped
to
create
two
additional
lanes:
an
added
exclusive
left-turn
pocket
and
an
added
through
lane
for
the
southbound
approach.
Eastbound
Tunnel
Avenue
shall
be
widened
to
the
east
of
its
existing
alignment
to
accommodate
two
receiving
lanes
for
the
southbound
left
and
eastbound
through
traffic.
These
improvements
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard
completed
prior
to
issuance
of
the
first
8
9
Mitigation
Measure
4.N-1b
provides
for
mitigation
of
Project
Site
development-related
impacts
in
the
Existing
plus
Project
condition,
while
this
mitigation
measure
provides
for
mitigation
in
the
Cumulative
With
Project
condition.
This
mitigation
measure
is
based
on
needed
modification
to
the
existing,
baseline
configuration
of
the
intersection,
and
does
not
assume
that
Mitigation
Measure
4.N-1b
is
implemented.
Existing
Bayshore
Boulevard
at
Old
County
Road
is
approximately
80
feet
wide
and
includes
two
through
lanes
for
each
direction
and
a
median.
Dedicated
right-turn
yield
lanes
are
currently
provided
at
all
four
approaches.
Brisbane
Baylands
Final
EIR
3-131
May
2015