BCC
Note:
"Building
permit"
should
replace
phrase
"occupancy
permit"
in
mitigation
measure.
1662
4.N-97
Mitigation
Measure
4.N-lb
Reads:
"
..
.including
modifications
to
the
tunnel
...
"
Since
there
is
no
tunnel
at
location
cited,
this
should
have
read,
"Tunnel
Avenue".
Bridge
has
limited
width
so
additional
lanes
can
only
be
added
near
Bayshore
Boulevard.
Traffic
already
backs
up
on
Tunnel
Avenue
overpass
at
times,
therefore
significant
unavoidable
congestion
would
occur
at
intersection
under
all
development
scenarios.
Mitigation
is
inadequate
to
address
problem,
even
with
removal
of
median.
Explain:
"Performance
standard
rather
than
a
prescriptive
mitigation
measure
is
proposed."
Unclear
as
stated.
664
1665
1666
4.N-98
Mitigation
Measure
4.N-lc
Mitigation
effective
only
if
the
main
thoroughfares
within
site
are
capable
of
handling
inbound
and
outbound
traffic
without
congestion.
Congestion
would
be
anticipated
in
vicinity
of
transit
hub
on
Geneva
Avenue
and
render
mitigation
inadequate.
Significant
congestion
is
anticipated
on
highway
101
from
proposed
arena
development
and
mitigation
will
not
achieve
stated
effectiveness
when
traffic
backs
up
on
site.
1667
668
4.N-99
Mitigation
Measure
4.N-ld
Regarding
impact
at
Alana
Way,
Harney
Way,
and
Thomas
Mellon
Drive
(intersection
10),
as
clearly
stated,
though
feasible,
mitigation
is
legally
under
jurisdiction
of
San
Francisco
and
implementation
cannot
be
assumed.
The
impacts
of
development
projects
CPP
and
CPP-V
are
stated
as
significant
unavoidable,
therefore
traffic
from
site
development
is
unacceptable
and
plans
should
be
re-examined
or
modified.
Again,
the
mitigation
measure
is
dependent
and
subject
to
San
Francisco's
approval
and
implementation.
Mitigation
improving
operations
at
intersection
from
projected
LOS
Level
"F"
to
either
"D"
or
"E"
seems
unrealistic
since
traffic
at
this
intersection
feeds
into
the
already
congested
Bayshore
Boulevard
and
onto
Highways
101
and
280
onramps.
Future
adjacent
development
projects
in
San
Francisco
and
Daly
City
will
bring
additional
congestion
to
this
narrow
corridor.
At
LOS
Levels
"E"
or
"F"
this
will
be
in
violation
of
Brisbane
General
Plan
Policy
38.
Site
plans
should
be
re-examined
for
this
reason
to
determine
their
appropriateness
and
design.
The
assertions
made
in
the
table
appear
understated.
Methodology
for
reaching
conclusions
needs
to
be
cited.
With
access
to
site
limited
to
4.N-99-100
Mitigation
Measure
4.N-le
Impact
at
Tunnel
Avenue
and
Bayshore
Blvd.
(Intersection
12)
4.N-101
Tuble
4.N-27
669
5-280