2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Recology-18
[See page
5-491 for the original comment]
The
microsimulation
analysis
called
for
in
Mitigation
Measure
4.G-1g
was
conducted
and
concluded
that
signal
timing
could
be
achieved
such
that
(1)
traffic
would
not
back
up
from
one
intersection
to
another
along
the
proposed
Geneva
Avenue
extension,
even
where
intersections
were
closely
spaced.
See
Master Response 26.
[See page
5-491 for the original comment]
The
Draft
EIR
concludes
that
the
US
101
southbound
segment
between
Third
Street
/
Bayshore
Boulevard
and
Harney
Way
will
operate
at
LOS
F
in
the
AM
peak
hour,
and
that
the
northbound
segment
will
operate
at
LOS
F
in
the
PM
peak
hour
under
Existing
Plus
Project
conditions,
and
that
impacts
to
the
freeway
mainline
would
be
significant
and
unavoidable
under
all
four
development
scenarios.
However,
the
analysis
and
conclusion
set
forth
in
the
Draft
EIR
are
for
the
peak
periods
assuming
full
build
out.
Recology
truck
operations
generally
do
not
coincide
with
peak
hour
traffic.
The
hardships
that
Recology
asserts
would
result
from
Baylands
development
will
be
considered
by
the
City
in
its
planning
review
and
decisionmaking
for
the
Baylands.
The
comment
does
not,
however,
raise
any
substantive
issues
regarding
the
adequacy
of
the
Draft
EIR
or
its
analyses
and
conclusions.
Recology-19
Recology-20
[See page
5-492 for the original comment]
The
Draft
EIR
concludes
that
the
intersection
of
Sierra
Point
Parkway
/
US
101
NB
Ramps
would
remain
at
LOS
F
under
the
CPP
and
CPP-V
scenarios
with
the
implementation
of
Mitigation
Measure
4.N-1c.
However,
the
analysis
and
conclusion
set
forth
in
the
Draft
EIR
is
for
the
peak
periods
assuming
full
build
out.
Recology
truck
operations
generally
do
not
coincide
with
peak
hour
traffic.
The
Draft
EIR
concludes
that
the
impact
to
this
intersection
would
be
significant
and
unavoidable.
Additional
mitigation
measures
were
explored
such
as
roadway
widening,
but
were
deemed
infeasible
due
to
constrained
right-of-way
both
on
the
bridge
off-ramp
and
north
of
the
intersection
between
the
Brisbane
Lagoon
and
US
101.
The
hardships
that
Recology
asserts
would
result
from
Baylands
development
will
be
considered
by
the
City
in
its
planning
review
and
decisionmaking
for
the
Baylands.
The
comment
does
not,
however,
raise
any
substantive
issues
regarding
the
adequacy
of
the
Draft
EIR
or
its
analyses
and
conclusions.
Recology-21
[See page
5-492 for the original comment]
The
LOS
for
intersection
19,
Tunnel
Avenue/Geneva
Avenue,
was
incorrectly
reported
in
Table
4.N-31.
The
intersection
operates
at
LOS
F
during
the
AM
peak
hour
and
LOS
C
during
the
PM
peak
hour.
In
response
to
this
comment,
Table
4.N-31
has
been
revised
to
reflect
the
correct
LOS
(see
Chapter
3
of
the
Final
EIR.
The
second
paragraph
on
page
4.N-110
of
the
Draft
EIR
is
revised
to
read
as
follows:
Brisbane
Baylands
Final
EIR
2.9.7-4
May
2015