RSF
John
A.
Swiecki,
AICP
January
23,
2014
Page
7
Page
4.N-109
Intersection
#6
(Sierra
Point
Parkway/US
101
NB
Ramps)
is
projected
to
operate
with
LOS
F
in
the
AM
peak
hours
under
Cumulative
With
Project
conditions.
As
stated
on
page
4.N-
119.
the
intersection
would
still
operate
at
LOS
F
even
with
mitigation
measure
4.N-3c.
This
intersection
is
an
important
secondary
access
to
the
Project
from
the
site
from
the
south,
serving
as
an
alternative
route
to
the
proposed
Geneva/Hamey
interchange
and
would
allow
site
traffic
to
exit
the
congested
freeway
sooner.
Additional
mitigation
measures
should
be
planned
for
this
location,
including
additional
traffic
lanes
to
improve
LOS
to
acceptable
levels.
Intersection
#19
(Tunnel
Avenue/Geneva
Avenue)
is
listed
as
an
intersection
that
..
would
operate
acceptably
under
Cumulative
With
Project
conditions
during
both
AM
and
PM
peak
hour".
This
is
inconsistent
with
the
results
for
this
intersection
in
Table
4.N-32.
20
I
21
Pages
4.N-111and4.N-113
Tables
4.N-3
l
and
4.N-32
provide
results
for
the
intersection
#19
(TunneJ
Avenue/Geneva
Avenue)
with
the
CPP-V
scenario.
However,
supporting
capacity
analysis
calculations
are
not
included
in
the
document.
As
a
result
it
is
not
possible
to
review
the
accuracy
of
these
results.
Page
4.N-123
Mitigation
4.N-1.g
states
that
"Should
full-access
intersections
along
the
Geneva
Avenue
extension
with
spacing
ofless
than
1,200
feet
be
proposed,
a
microsimulation
of
all
proposed
intersections
along
the
extension
shall
be
undertaken."
Figures
4.N-12,
4.N-13
and
4.N-14
show
intersection
spacing
less
than
1,200
feet.
If
these
intersections
are
proposed
to
provide
full
access,
a
microsimulation
analysis
should
be
completed
as
part
of
the
ElR
in
order
to
adequately
assess
the
traffic
circulation
impacts.
If
the
intersections
are
not
proposed
to
provide
full
access
(i.e.
if
they
are
proposed
as
right-in/right-out
only),
then
this
should
be
stated
explicitly.
23
Page
4.N-145
Impact
4.N-12
states
that
"Construction
activities
would
result
in
significant
impacts
on
existing
and
cumulative
traffic
flow".
The
Construction
Management
Plans
identified
in
Mitigation
4.N-12
should
be
developed
in
coordination
with
Recology
as
any
disruption
in
access
to
its
existing
facility
would
negatively
affect
solid
waste
collection
in
San
Francisco.