2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
As
shown
in
those
tables,
among
the
intersections
analyzed
in
this
document,
the
following
four
would
operate
acceptably
under
Cumulative
With
Project
conditions
during
both
AM
and
PM
peak
hour,
and
the
cumulative
impact
would
be
less
than
significant:
2.
3.
10.
13.
19.
Recology-22
Guadalupe
Canyon
Parkway
&
Bayshore
Boulevard
Valley
Drive
&
Bayshore
Boulevard
Harney
Way
&
Thomas
Mellon
Drive
Blanken
Avenue
&
Tunnel
Avenue
Tunnel
Avenue
&
Geneva
Avenue
[See page
5-492 for the original comment]
The
Traffix
worksheets
for
this
location
were
erroneously
omitted
from
Technical
Appendix
K.
Please
see
Final
EIR
Appendix
K-26
for
these
level
of
service
worksheets.
[See page
5-492 for the original comment]
The
microsimulation
analysis
called
for
in
Mitigation
Measure
4.G-1g
was
conducted,
and
concluded
that
signal
timing
could
be
achieved
such
that
(1)
traffic
would
not
back
up
from
one
intersection
to
another
along
the
proposed
Geneva
Avenue
extension,
even
where
intersections
were
closely
spaced.
See
Master Response 26.
[See page
5-492 for the original comment]
The
City’s
review
of
Construction
Management
Plans
will
take
into
consideration
the
need
for
maintaining
appropriate
access
to
the
Recology
facility,
as
well
as
other
businesses
within
the
Baylands.
[See page
5-493 for the original comment]
Table
4.I-1
of
the
Draft
EIR
provides
a
detailed
analysis
of
the
consistency
of
each
concept
plan
scenario
with
the
provisions
of
the
Brisbane
General
Plan.
Table
4.I-1
clearly
states
that
the
DSP
and
DSP-V
are
inconsistent
with
General
Plan
Policy
330.1,
which
prohibits
housing
within
the
Baylands.
[See page
5-493 for the original comment]
See
Master Response 20
for
a
discussion
of
land
use
compatibility.
In
the
DSP
scenario,
retail
uses
are
proposed
to
the
south
of
the
Recology
site
between
the
Geneva
Avenue
extension
and
Recology.
Retail
uses
are
also
proposed
to
the
west
of
Recology
along
the
east
side
of
the
Caltrain
right-of-way.
In
the
DSP-V
scenario,
a
multi-plex
theater
complex
and
office
uses
replace
some
of
the
retail
areas
lying
between
Recology
and
the
Geneva
Avenue
extension.
These
uses
are
similar
to
uses
proposed
in
the
CPP
scenario
(cultural/
entertainment,
office/instructional)
to
which
the
comment
letter
does
not
object.
The
proposed
Brisbane
Baylands
Specific
Plan
prepared
by
the
applicant
for
the
DSP
and
DSP-V
scenarios
states
on
page
287
that
development
adjacent
to
the
Recology-23
Recology-24
Recology-25
Recology-26
Brisbane
Baylands
Final
EIR
2.9.7-5
May
2015
Previous Next