OSEC
Open
Space
&
Ecology
CEQA
Comments
on
Brisbane
Baylands
Draft
EIR
-
2013
Page4.0-58
On
site
sorting
would
greatly
decrease
the
waste
stream.
General
comments
on
section
4.0:
I.
The
DEIR
does
not
cover
methane
capture.
Currently
the
landfill
is
still
producing
methane
although
according
to
UPC
not
at
high
enough
levels
to
make
it
economically
viable.
Could
the
remaining
methane
be
shunted
to
Recology
since
they
are
planning
a
methane
facility?
Methane
can
also
be
a
byproduct
of
grey
water
processing.
Could
this
methane
also
be
sold/passed
to
Recology?
Methane
is
an
important
environmental
issue
since
it
is
both
a
powerful
greenhouse
gas
and
a
source
of
energy.
I
I
I
I
I
375
376
2.
A
search
of
the
DEIR
returns
no
results
for
EMF
(electric
and
magnetic
fields).
There
is
growing
scientific
concerns
about
the
long
term
health
and
environmental
effects
of
exposure
to
EMF.
This
issue
is
covered
in
other
DEIRs
and
we
should
require
the
same.
3.
When
does
the
recycled
water
plant
plan
to
be
built?
Estimate
date?
Estimated
water
availability?
Economic
triggers?
4.
Since
the
project
is
going
to
last
longer
than
20
years
should
not
the
water
supply
also
last
longer
than
20
years?
What
happens
if
OID
does
not
sell
us
the
water?
5.
What
happens
if
OID
no
longer
has
a
supply
of
water
to
sell?
6.
The
DEIR
does
not
address
phone/internet
services
which
are
essential
to
many
businesses.
Currently
Brisbane
has
as
we
understand
it,
no
additional
capacity
for
these
services
without
upgrading
infrastructure.
This
issue
must
be
addressed
at
some
point
within
the
planning
and
review
process.
7.
All
through
this
section,
it's
assumed
that
the
water
transfer
will
not
have
significant
environmental
impacts
due
to
mitigations
measures.
However,
we
have
seen
going
through
our
own
DEIR
that
mitigation
measures
are
not
always
meaningful.
8.
Mitigation
of
storm
water:
Roofing
material
has
a
small
effect
on
water
quality,
the
larger
factor
is
the
pollution
absorbed
from
the
atmosphere
prior
to
precipitation
and
particulates
deposited
on
the
roof.
http://www.bae.ncsu.edu/stormwater/PublicationFiles/RooftopRunoff2009.pdf
Roofing
materials
do
have
an
affect
on
the
conditions
under
which
rain
water
can
be
harvested.
Information
from
Water
Shed.org
indicates
that
a
tar
and
gravel
roof
will
yield
15%
less
water.
http://watershedmg.org/sites/default/files/docs/wmg
calculating
runoff
worksheet.pdf
The
experience
here
in
Brisbane
is
more
dramatic.
Barbara
Ebel
has
a
600
gallon
of
tank
collecting
from
their
sloped
metal
roof
and
600
gallons
of
storage
fed
by
the
neighbor's
roof.
Both
roofs
are
of
approximately
the
same
size.
During
the
first
storm
of
the
season,
the
tanks
connected
to
the
metal
roof
over
topped.
The
tanks
connected
to
the
flat
T
&G
roof
reached
75%
capacity.
Ebel's
metal
roof
will
continue
to
yield
small
amounts
of
water
from
morning
dew
10
months
out
of
the
average
normal
year
while
the
T
&G
roof
yields
nothing
in
anything
less
than
a
sustained
rainfall.
377
378
I
379
I
380
381
382
I
383
Chapter
4.P:
Energy
Resources
Page4.P-2
Under
Natural
Gas
and
Petroleum,
second
line.
This
chapter
confirms
that
there
are
some
natural
gas
pipelines
near/under
the
Bay
lands.
A
24"
along
Bayshore
Blvd
and
a
6"
running
along
Tunnel
Ave.
A
map
of
all
gas
lines
should
be
included.
Page
4.P-8
Paragraph
l
states
"S-14-08
raises
California's
renewable
energy
goals
to
33%
by
2020."
However,
it
neglects
to
state
where
we
are
in
terms
of
meeting
those
goals.
Since
this
forms
part
of
the
regulatory
setting,
it's
important
to
know
when
evaluating
the
project.
Additionally,
who
does
S-14-08
apply
to?
I
I
384
385
52
5-357
Previous Next