2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
shall
be
submitted
to
the
City
for
review
and
consultation
with
affected
utilities
a
minimum
of
two
weeks
prior
to
commencement
of
construction
activities.
If
underground
utilities
are
identified
within
15
feet
of
proposed
pile
driving
activities,
alternative
pile
installation
methods
shall
be
required.
Alternative
methods
may
include
use
of
sonic
drivers
or
drilled
and
cast-in-place
piles.
All
pile
driving
shall
be
designed
so
as
to
result
in
peak
particle
velocity
of
less
than
4.0
in/sec
(100
mm/s)
at
the
location
of
underground
utilities.
Within
one
week
following
completion
of
pile
driving
activities,
a
post-
construction
assessment
of
all
underground
utilities
within
30
feet
of
the
pile
driving
activity
shall
be
submitted
to
the
City
by
the
contractor,
confirming
that
no
damage
to
any
underground
utilities
occurred
as
the
result
of
the
pile
driving
activity.
Should
the
post-construction
assessment
determine
that
underground
utilities
were
damaged
by
pile
driving
activities,
such
damage
shall
be
repaired
by
the
contractor
to
the
satisfaction
of
the
City
and
affected
utility.
In
addition,
the
first
full
paragraph
on
page
4.J-26
is
hereby
revised
to
read:
Conclusion
with
Mitigation:
With
implementation
of
Mitigation
Measures
4.J-2a,
and
4.J-2b,
and
4.J-2c,
groundborne
vibration
impacts
on
multi-family
housing
under
the
DSP
and
DSP-V
scenarios,
and
on
the
Roundhouse
and
underground
utilities
and
pipelines
for
Project
Site
development
would
be
less
than
significant.
The
Draft
EIR
statement
on
page
26
cited
in
this
comment
makes
no
value
judgment
as
to
whether
the
amount
of
onsite
population
under
the
No
Project
–
General
Plan
Buildout
Alternative
is
beneficial
or
detrimental.
The
cited
statement
notes
only
that
the
reduced
amount
of
development
within
the
Baylands
under
that
alternative
would
not
likely
meet
one
of
Project
Site
development’s
objectives
–
supporting
a
robust
expansion
of
transit.
A
“fixed
axis”
PV
system
is
one
whose
photovoltaic
panels
are
constructed
at
a
stationary
angle
and
do
not
move
during
the
day.
A
“single
axis”
tracking
PV
system
is
one
whose
photovoltaic
panels
are
constructed
so
as
to
turn
along
a
single
axis
during
the
day
to
maximize
capture
of
sunlight.
The
reasoning
behind
the
identification
of
the
environmentally
superior
alternative
is
set
forth
in
Draft
EIR
Section
5.4.
As
stated
on
page
the
No
Project-No
Build
Alternative
“would
not
be
environmentally
superior
since
it
allows
existing
site
contamination
to
continue
without
remediation.”
Brisbane
Baylands
Final
EIR
2.9.3-126
May
2015