Table
of
Contents
Page
 
List
of
New
or
Revised
Tables
Project
Components
Analyzed
in
the
Brisbane
Baylands
EIR
1-4
Project
Daily
Person
Trip
Generation
–
Enhanced
Transit
2.9.15-13
Project
Peak
Hour
Vehicle
Trip
Generation
–
Enhanced
Transit
2.9.15-14
Project
Person
and
Vehicle
Trips
by
Mode
2.9.15-14
Mode
Share
By
Origin/Destination
2.9.15-15
AM
and
PM
Peak
Period
Transit
Trip
Assignment
by
Transit
Operator
and
Corridor
2.9.15-16
UPC
1-3.5B
Off-Peak
Transit
Trip
Assignment
by
Transit
Operator
and
Corridor
2.9.15-16
UPC
1.3.5C
Daily
Transit
Trip
Assignment
by
Transit
Operator
and
Corridor
2.9.15-17
UPC
1.3-6
Daily
Transit
Trip
Assignment
by
Transit
Operator
and
Corridor
2.9.15-17
UPC
1-3.7
Transit
Trip
Assignment
(PM
Peak
Hour
Trips)
2.9.15-18
UPC
1-3.7B
Transit
Trip
Distribution
(Daily
Trips)
2.9.15-19
UPC
1-3.8
Intersection
Level
of
Service
–
Cumulative
Without
Project
and
Cumulative
With
Project
Enhanced
Transit
Conditions
–
Weekday
AM
Peak
Hour
2.9.15-21
UPC
1-3.9
Intersection
Level
of
Service
–
Cumulative
Without
Project
and
Cumulative
With
Project
Enhanced
Transit
Conditions
–
Weekday
PM
Peak
Hour
2.9.15-23
UPC
1-3.10
US-101
Mainline
Segment
Level
of
Service
–
Cumulative
Without
Project
and
Cumulative
With
Project
Conditions
2.9.15-25
UPC
1-3.11
Cumulative
Without
Project
and
With
Enhanced
Transit
Regional
Train
Transit
Screenlines
2.9.15-27
UPC
1-3.11B
Cumulative
Without
Project
and
With
Enhanced
Transit
Caltrain
Screenlines
2.9.15-28
UPC
1-3.12
Enhanced
Transit
Contribution
to
San
Francisco
Transit
Screenlines
2.9.15-29
4.C-2
Average
Monthly
Catch
(Fish
per
Hectare)
of
Longfin
Smelt
(All
Life
Stages
Combined)
at
CDFW
South
Bay
Otter
Trawl
Stations,
2001-2011
(Revised)
3-51
4.C-3
Average
Monthly
Catch
(Fish
per
Hectare)
of
Longfin
Smelt
(all
Life
Stages
Combined)
at
CDFW
South
Bay
Otter
Trawl
Stations,
1980-1986
(Revised)
3-51
4.C-1
Special-Status
Potentially
Occurring
within
the
Proposed
Site
(Revised)
3-63
4.D-1
Historical
Significance
of
Resources
within
or
Adjacent
to
Project
Site
(Revised)
3-76
4.F-2
Estimated
Emissions
of
Greenhouse
Gases
(Year
20402035)
from
Operation
of
the
CPP
and
CPP-V
Scenarios
(Revised)
3-82
4.J-9
Construction
Hours
Allowed
by
Mitigation
Measure
4.J-4A
(New)
3-104
4.M-1
Parks
Serving
Brisbane
(Revised)
3-108
4.M-2
Recreational
Facilities
in
Brisbane
(Revised)
3-109
4.O-6
Annual
Wastewater
Flows
for
Bayshore
Sanitary
District,
2007-2011
3-136
5-8
Comparison
of
Impacts
for
Project
Site
Scenarios
and
Alternatives
(New)
3-145
6-1
Significant
Unavoidable
(SU)
Impacts
by
Project
Development
Scenario
(Revised)
3-211
1-1
UPC
1-3.1
UPC
1-3.2
UPC
1-3.3
UPC
1-3.4
UPC
1-3.5A
Brisbane
Baylands
Final
EIR
viii
May
2015
Previous