2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
UPC
1-3.11
CUMULATIVE
WITHOUT
PROJECT
AND
WITH
ENHANCED
TRANSIT
REGIONAL
TRAIN
TRANSIT
SCREENLINES
Cumulative
Without
Project
–
AM
Peak
Hour
Ridership
BART
East
Bay
BART
South
Bay
Caltrain
South
Bay
36,202
12,416
5,478
Capacity
19,569
13,951
6,500
Utilization
185%
89%
84%
BART
East
Bay
BART
South
Bay
Caltrain
South
Bay
Cumulative
With
Enhanced
Transit
–
AM
Peak
Hour
Ridership
36,454
12,525
5,937
Capacity
19,569
13,951
6,500
Utilization
186%
90%
91%
Cumulative
Without
Project
–
PM
Peak
Hour
Ridership
BART
East
Bay
BART
South
Bay
Caltrain
South
Bay
30,268
10,707
5,442
Capacity
19,655
14,088
6,500
Utilization
154%
76%
84%
Cumulative
With
Enhanced
Transit
–
PM
Peak
Hour
Ridership
BART
East
Bay
BART
South
Bay
Caltrain
South
Bay
30,500
10,819
5,898
Capacity
19,655
13,951
6,500
Utilization
155%
78%
91%
SOURCE:
Fehr
&
Peers,
2014
It
is
assumed
that
under
enhanced
transit
conditions,
project
trips
are
distributed
equally
over
the
trains
that
operate
through
Brisbane
Station
during
the
peak
hour.
According
to
Existing
Conditions
chapter
in
the
Draft
EIR,
the
maximum
load
on
Caltrain
is
355
in
the
northbound
AM,
286
in
the
southbound
AM,
305
in
the
northbound
PM,
and
389
in
the
southbound
PM.
It
is
conservatively
assumed
that
the
maximum
load
point
occurs
both
immediately
north
and
immediately
south
of
Brisbane
Station
such
that
the
maximum
load
point
upon
additional
of
Project
trips
would
be
located
at
the
side
of
the
Station
where
more
trips
are
added.
Under
enhanced
transit
conditions,
326
Project
trips
per
hour
are
added
in
the
northbound
AM
(towards
Brisbane),
311
Project
trips
per
hour
are
added
in
the
southbound
AM
(towards
Brisbane),
302
Project
trips
per
hour
are
added
in
the
northbound
AM
(away
from
Brisbane),
and
320
Project
trips
per
hour
are
added
in
the
southbound
PM
(away
from
Brisbane)
(see
Table
UPC
1-3.11B
).
Following
Caltrain
electrification,
which
is
scheduled
for
completion
between
the
winter
of
2020
and
the
spring
of
2021,
Caltrain
would
operate
six
trains
per
peak
hour
per
direction.
Frequency
of
service
at
the
Bayshore
Station
under
Cumulative
Plus
Project
enhanced
transit
conditions
is
assumed
to
be
increased
under
enhanced
transit
conditions
to
be
commensurate
with
high-ridership
non-
terminus
stations
along
commuter
rail
corridor
(such
as
Palo
Alto,
Redwood
City,
and
Hillsdale).
Project
Site
development
under
enhanced
transit
conditions
would
generate
a
daily
increase
in
Caltrain
ridership
of
7,063
riders.
This
level
of
ridership
exceeds
that
of
most
stations
on
the
Caltrain
line
today.
In
addition,
additional
ridership
Brisbane
Baylands
Final
EIR
2.9.15-27
May
2015