3.
Revisions
to
the
Text
of
the
Draft
EIR
Utilities,
Service
Systems,
and
Water
Supply
Page
4.O-10
[See
page
for
the
original
comment]
REPLACE
Draft
EIR
Figure
4.O-1
with
revised
Figure
4.O-1
which
follows
this
page,
to
better
distinguish
the
lagoon
boundary
from
water
lines.
[See
page
for
the
original
comment]
REVISE
Table
4.O-6
to
read
as
follows:
Page
4.O-13
TABLE
4.O-6
ANNUAL
WASTEWATER
FLOWS
FOR
BAYSHORE
SANITARY
DISTRICT,
2007-2011
For
Period
Ending
June
30
2011
2007
148.17
141.75
0.41
0.39
2010
2008
144.57
140.80
0.40
0.39
2009
2008
2010
140.80
144.57
0.39
0.40
2007
2011
141.75
148.17
0.39
0.41
Total
Annual
Flow
(MG)
Daily
Flow
(mgd)
137.30
0.38
NOTES:
MG
=
million
gallons,
mgd
=
million
gallons
per
day
SOURCE:
Adapted
from
Yeager,
2012
Page
4.O-42
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.O-1b
on
Draft
EIR
page
4.O-42
as
follows:
Mitigation
Measure
4.O-1b:
Controlled
Releases
to
Recharge
Groundwater
in
Streamside
Meadows
and
Other
Alluvial
Deposits.
The
SFPUC
is
implementing
a
program
of
controlled
releases
as
a
mitigation
measure
adopted
as
part
of
its
WSIP.
Brisbane
will
support
the
SFPUC
in
implementing
the
following
mitigation
measure,
contributing
its
fair
share
for
the
cost
of
the
mitigation
effort
by
using
some
of
the
OID
transfer
water
to
augment
storage
in
the
SFPUC’s
Hetch
Hetchy
Reservoir.
Such
fair
share
contribution
of
OID
transfer
water
is
intended
to
support
the
controlled
releases,
by
funding
and/or
implementing
other
elements
of
the
SFPUC’s
monitoring
and
adaptive
management
program
for
the
Poopenaut
Valley
meadow
and
alluvial
habitats.
As
part
of
this
measure
the
SFPUC’s
controlled
release
mitigation
measure,
the
SFPUC
will
gather
baseline
data
regarding
the
extent,
species
composition
and
condition
of
the
existing
meadow
vegetation
within
the
Poopenaut
Valley.
Some
of
these
environmental
baseline
data
may
be
available
as
a
result
of
current
study
efforts
in
the
Poopenaut
Valley.
Some
of
these
environmental
baseline
data
may
be
available
as
a
result
of
current
study
efforts
in
the
Poopenaut
Valley.
As
needed,
the
SFPUC
will
augment
this
information
by
carrying
out
vegetation
composition
surveys
in
the
meadow
before
implementing
the
WSIP
and
at
5
year
intervals
after
WSIP
implementation
to
assess
the
efficacy
of
mitigation
releases
in
maintaining
or
improving
the
percentage
cover
of
meadow
species
as
described
by
Brisbane
Baylands
Final
EIR
3-136
May
2015