1.
Introduction
TABLE
1-1
PROJECT
COMPONENTS
ANALYZED
IN
THE
BRISBANE
BAYLANDS
EIR
Development
Scenario
Project
Component
Concept
Plan
General
Plan
Amendment
Specific
Plan
1
Site-Specific
Development
Recology
Expansion
Lumberyard
Relocation
Site
Remediation
Importation
of
Water
Supply
Onsite
Recycled
Water
Plant
DSP
DSP-V
CPP
CPP-V
=
Development
scenario
includes
this
Project
component
1
Since
the
Brisbane
General
Plan
requires
preparation
of
a
Specific
Plan
prior
to
development
within
the
Baylands,
the
CPP
or
CPP-V
Concept
Plan
scenarios
would
require
future
preparation
and
environmental
analysis
of
a
Specific
Plan.
SOURCE:
ESA,
2012.
1.3
Format
of
the
Final
EIR
The
following
chapters
are
contained
within
this
document:
Volume
I
Chapter
1,
Introduction,
describes
CEQA
requirements
and
the
content
of
the
Final
EIR.
Chapter
2,
Response
to
Comments,
provides
a
list
of
agencies,
organizations,
and
interested
individuals
who
commented
on
the
Draft
EIR
along
with
responses
to
each
of
their
comments.
Chapter
3,
Revisions
to
the
Draft
EIR.
This
chapter
sets
forth
revisions
made
to
the
Draft
EIR
as
a
result
of
the
comments
received
by
agencies,
organizations
and
individuals
as
described
in
Chapter
2,
and/or
errors
and
omissions
discovered
subsequent
to
release
of
the
Draft
EIR
for
public
review.
Volume
II
Chapter
4,
Mitigation,
Monitoring,
and
Reporting
Program.
This
chapter
includes
the
Mitigation
Monitoring
and
Reporting
Program
(MMRP)
prepared
based
on
the
mitigation
measures
included
in
this
Final
EIR
.
CEQA
requires
lead
agencies
to
“adopt
a
reporting
and
mitigation
monitoring
program
for
the
changes
to
the
project
which
it
has
adopted
or
made
a
condition
of
project
approval
in
order
to
mitigate
or
avoid
significant
effects
on
the
environment”
(CEQA
§21081.6,
CEQA
Guidelines
§15097).
Brisbane
Baylands
Final
EIR
1-4
May
2015
Previous Next