RSF
John
A.
Swiecki,
AICP
January
23,
2014
Page
9
•
increased
energy
efficiency
and
on-site
renewable
energy
production,
including
rc:covery
and
local
reuse
of
energy
from
the
material
stream.
Section
4.F-15
of
the
DEIR
acknowledges
that
the
installation
of
photovoltaic
generation
results
in
··negative"
GHG
emissions,
but
it
appears
the
renewable
energy
sources
planned
at
the
Recology
site
were
not
fully
included
in
the
DEIR
calculations.
The
expanded
Recology
site
is
planned
as
a
zero
net
energy
facility,
fully
self-
powered
by
renewable
energy.
It
includes
highly
passive
and
energy
efficient
buildings
(which
already
include
several
of
the
proposed
mitigation
measures
listed
in
section
4.F-18).
The
low
energy
buildings
are
then
supplied
by
several
roof-mounted
photovoltaic
installations,
as
well
as
heat
and
electricity
generated
from
wastestream-
based
biogas
using
clean
fuel
cell
generators.
The
net
zero
GHG
emissions
resulting
from
the
operation
of
the
project
should
be
included
in
the
"unmitigated"
calculation
results
as
they
will
occur
as
part
of
the
base
Recology
site
master
plan.
Additionally,
since
the
current
EIR
analysis
only
considers
net
increases
in
building
square
footage
and
because
this
action
by
Recology
will
reduce
the
emissions
from
the
entire
Recology
facility
(including
existing
buildings
remaining
and
to
be
replaced),
the
EIR
should
fully
account
for
the
resulting
reduction
in
GHG
emissions
across
the
site.
Lastly,
regarding
the
baseline
for
comparison,
it
appears
that
400,000
kWh
equivalent
of
natural
gas
was
not
included
in
existing
usage
due
to
units
of
measurement
confusion.
The
EIR
should
account
for
this
energy
sum,
as
it
increases
GHG
reductions
represented
by
the
CPP~V
.
It
also
appears
that
the
EIR
analysis
did
not
account
in
the
baseline
for
Recology
operations
that
are
outside
of
the
Brisbane
site
boundaries
(i.e.
adjacent
property
in
San
Francisco.
consolidated
Recology
sites
presently
in
San
Francisco
but
being
relocated
to
the
Beatty
site).
The
EIR
should
account
for
all
impacted
operations
in
buildings
not
under
the
long
tenn
control
of
Recology.
•
Reduction
in
potable
water
use
and
water
import.
While
the
URBEMIS/BGM
models
address
the
GHG
emissions
associated
with
the
water
use,
it
is
not
clear
that
Recology
has
been
credited
with
full
supply
of
all
its
own
nonpotable
water.
Recology
will
do
th.is
through
dewatering
of
organics
di
gestate,
essentially
squeezing
water
from
the
organics
waste
stream.
Recology
will
not
only
meet
its
own
nonpotable
water
demands,
but
will
produce
surplus
water
that
can
be
treated
to
significantly
reduce
water
use
in
the
rest
of
the
CPP-V
project.
These
savings
should
be
estimated
and
included
in
the
DEIR
GHG
assessment.
The
DEIR
has
assumed
a
non-potable
water
treatment
plant
in
the
DSP.
The
DElR
should
provide
additionaJ
information
on
the
certainty
of
the
plant
and
the
timing
of
its
completion.
5-494