2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
decrease
in
operational
emissions
at
other
sites
currently
occupied
by
Recology
should
they
be
vacated
under
the
proposed
consolidation
of
facilities,
it
was
conservatively
assumed
in
the
Draft
EIR
and
Final
EIR
that
the
potential
exists
for
these
sites
to
be
back-filled
with
new
uses
and
no
GHG
emission
reduction
would
result.
Recology-30
[See page
5-494 for the original comment]
As
stated
on
page
3-2
of
the
Draft
EIR
and
presented
in
Table
3-1
of
the
Draft
EIR,
all
four
project
scenarios,
including
the
CPP-V
scenario,
are
assumed
to
include
acquisition
of
a
supplemental
water
supply
of
up
to
2,400
acre-feet
per
year
(AFY)
via
a
water
transfer
agreement
with
the
Oakdale
Irrigation
District.
Consequently,
calculation
of
water
and
wastewater-related
GHG
emissions
are
based
on
this
water
acquisition
rate
of
2,400
acre-feet
per
year
in
both
the
Draft
EIR
and
updated
Final
EIR
calculations.
No
additional
water
demand
was
assumed
related
to
any
land
use
or
other
project
scenario.
The
proposed
onsite
recycled
water
plant
would
be
constructed
once
sufficient
wastewater
flows
were
being
generated
within
the
Baylands
to
provide
for
efficient
plant
operations.
Because
technologies
for
recycled
water
plant
design
continually
evolve,
a
specific
numerical
threshold
that
would
trigger
plant
construction
has
not
been
set.
A
specific
target
flow
that
would
trigger
the
required
construction
of
the
onsite
recycled
water
plant
will
be
determined
by
the
City
as
part
of
its
review
of
proposed
water
and
wastewater
plans.
This
target
flow
will
be
based
on
a
combination
of
the
amount
of
wastewater
generated
within
the
Baylands
and
the
demand
generated
by
Baylands
development
for
recycled
water.
The
combination
of
available
wastewater
for
recycling
and
demand
for
recycled
water
supply
will
be
evaluated
to
determine
the
level
of
Baylands
development
needed
to
provide
for
efficient
operation
of
the
recycled
water
plant.
The
Draft
EIR
acknowledges
that
as
much
as
75
percent
of
Project
Site
development
could
occur
prior
to
construction
of
the
recycled
water
plant.
Recology-31
[See page
5-495 for the original comment]
The
GHG
reductions
that
would
be
realized
by
reduced
truck
travel
associated
with
reduced
removal
of
dewatering
the
organic
waste
stream
is
based
on
trip
generation
estimates
provided
by
Recology’s
transportation
consultant
and
the
GHG
emissions
reductions
cited
in
Comment
Recology-31
are
therefore
already
accounted
for
in
the
Draft
EIR.
[See page
5-495 for the original comment]
No
quantifiable
evidence
was
identified
that
vehicles
miles
travelled
would
be
reduced
as
the
result
of
proposed
consolidation
of
Recology
facilities
under
the
CPP-V
development
scenario.
In
addition,
because
(1)
the
extent
to
which
Recology’s
existing
San
Francisco
facilities
would
be
consolidated
at
their
Tunnel
Avenue
site
and
(2)
those
facilities
would
be
used
for
other
non-Recology
purposes
following
Recology-32
Brisbane
Baylands
Final
EIR
2.9.7-7
May
2015
Previous Next