"The
estimated
future
electrical
loads
used
for
this
analysis
are
based
on
commonly
accepted
consumption
factors."
What
are
these
commonly
accepted
consumption
factors?
Who
accepts
them?
Do
they
take
into
account
the
goal
of
sustainability
and
increasing
awareness
of
the
need
to
conserve
energy
as
well
as
technological
advances
expected
to
occur
over
the
next
30
years?
Page
4.P-10
"Natural
gas
loads
for
the
DSP
and
DSP-V
also
were
projected
based
on
proposed
land
uses
and
square
footages
of
such
uses.
"
How
are
natural
gas
loads
for
different
land
uses
determined?
It
says
'Title
24'
will
be
used
but
how?
Does
it
use
the
maximum
permissible
as
a
baseline
or
something
else?
Is
there
any
provision
change
in
Title
24
as
time
goes
on?
Standards
are
increasing
as
of
Jan
1,
2014
and
will
likely
do
so
again
many
times
over
the
period
of
build
out
of
the
Baylands.
Page4.P-l0
"Projected
vehicular
fuel
use
associated
with
ongoing
Project
Site
development
operations
were
estimated
using
URBEMIS
model
runs
conducted
to
estimate
baseline
and
Project-related
air
pollutant
emissions"
The
URBEMIS
model
outputs
Total
Trips
and
Vehicles
Miles
Traveled
but
do
the
calculations
for
vehicular
fuel
use
account
for
changes
in
regulation
and
technology
over
the
period
of
build
out?
How
would
stricter
CAFE
standards
and
increased
adoption
of
electric
vehicles
affect
estimates
for
fuel
use?
Page
4.P-IO
References
Appendix
N
which
references
in
footnote
2:
http://www.epa.gov/oswercpa/docs/r09-l
l-004
brisbane.pdf
This
is
a
broken
link.
Page
4.P-11
Paragraph
2
mentions
"new
utility
trenches
for
electricity
and
natural
gas
...
"
Paragraph
6
also
mentions
"regulations
pits
...
20'
long
by
45'
wide".
Details
of
these
trenches
are
covered
in
the
appendices.
If
details
are
not
included
in
the
section,
then
the
appendices
that
have
details
should
be
referenced.
Page
4.P-11
Paragraph
6
mentions
"regulations
pits
...
20'
long
by
45'
wide"
Are
these
also
covered
in
another
section?
What
is
the
purposed
depth
of
the
pits?
Page
4.P-
11
Details
should
be
placed
in
an
appendix
for
PG&E
standards
including:
Trenches
and
pits
should
be
explained
in
detail;
including
purpose
and
all
dimensions
details
of
electrical
and
gas
lines,
and
installation
of
infrastructure.
Page
4.P-13
Paragraph
2
states,
"See
section
4.A.
..
,
4.B
...
4.C
and
4.F
for
a
discussion
of
operation
impacts
of
energy
generation
infrastructure
and
facilities
in
relation
to
potential
...
impacts."
The
energy
generation
infrastructure
is
not
directly
addressed
in
any
of
these
chapters.
Page
4.P-14-18
Mitigation
Measure
4P-
l
This
measure
requires
several
steps
from
construction
contractors
to
reduce
energy
usage.
How
would
this
measure
be
enforced,
and
who
would
do
it?
Mitigation
Measures
4P-2A,
-2b,
-2c
Beginning
on
p.
4P-l
7,
the
DEIR
states
this
measure
"
...
requires
Project
Site
development
to
exceed
the
Title
24
energy
efficiency
standards
effective
as
of
the
date
of
certification
of
this
EIR
by
at
least
20
percent."
Project
build
out
will
take
decades,
and
the
standards
effective
as
of
the
date
of
certification
of
the
EIR
will
soon
be
inadequate.
It
would
be
preferable
to
require
that
building
energy
efficiency
standards
must
exceed
state
minimum
standards
as
of
the
date
the
project
is
approved
by
at
least
20%.