BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
65
Comment:
It
is
not
practical
to
create
a
master
plan
so
late
in
the
game,
i.e.,
"during
the
devel-
opment
of
the
final
design
documents."
The
DEIR
should
require
more
detailed
plans
from
the
landowner.
1
3
08
cont
.
Subject:
Infrastructure
Plan,
wastewater
systems
Comment:
The
DEIR
should
contain
an
actual
sanitary
sewer
plan.
The
conceptual
plan
is
in-
adequate
to
base
a
decision
on.
Subject:
Infrastructure
Plan,
stormwater
treatment,
pp.
86-87
Comment:
There
doesn't
seem
to
be
any
bioswale
drainage
area
except
for
a
reference
to
efflu-
ent.
Please
clarify.
I
I
I
309
310
Subject:
Infrastructure
Plan,
stormwater
treatment,
pp.
86-87
Comment:
The
stormwater
coming
from
Midway
Village
through
the
Levinson
marsh
may
al-
ready
contain
contaminants
from
previous
PG&E
lampblack
deposits.
Please
clarify
in
the
DEIR
how
this
stormwater
will
be
monitored
and
treated.
311
Subject:
Infrastructure
Plan,
p.
93,
Conceptual
Dry
Utility
System;
and
p.
217,
Conceptual
Storm
Drainage
System.
31
2
Comment:
These
plans
are
not
adequate.
They
are
described
too
generally
to
base
an
analysis
on
them.
The
DEIR
should
contain
a
more
detailed
description
of
the
proposed
utility
system.
Subject:
Draft
Specific
Plan,
p.
249,
section
8.3
.7
Minor
Administrative
Permits
Comment:
This
suggested
procedure
from
the
applicant
usurps
City
authority.
The
DEIR
should
make
clear
that
tenant
or
successor
occupants
of
the
Baylands
will
be
required
to
observe
restric-
tions
as
imposed
by
the
City
of
Brisbane.
3
13
Subject:
Draft
Specific
Plan,
p.
234,
section
7.6
Emergency
Service
Comment:
The
police
and
fire
resources
that
will
be
needed
are
very
vague
and
the
cost
could
not
be
determined
from
the
information
here.
There
is
no
innovative
disaster
preparation
de-
scribed
despite
the
tank
farm,
probably
liquefaction
in
the
event
of
an
earthquake,
and
a
train
track
down
the
middle
of
the
site.
314
The
DEIR
should
contain
detailed
plans
for
emergency
services.
Subject:
Draft
Specific
Plan,
5.4.3.
12
Bay
Trail
Greenway
Comment:
As
shown
in
Figure
5.6,
the
Bay
Trail
Greenway/Sierra
Point
Parkway
could
flood
US.
101.
Figure
5.6
shows
Sierra
Point
parkway
17
feet
above
101.
Subject:
Draft
Specific
Plan,
5.4.3.7
South
Visitacion
Park
l
316
5-152
Previous Next