2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Mitigation
Measure
4.H-4a
requires
that
all
site-specific
development
include
systemwide
drainage
improvements
to
protect
proposed
development.
Onsite
drainage
systems
would
be
designed
to
tie
into
any
related
systems
for
U.S.
101,
and
would
be
in
conformance
with
all
applicable
City
and
Caltrans
design
standards
to
prevent
flooding
the
freeway.
Mitigation
Measure
4.H-4a
requires
that
an
on-site
storm
drainage
system
be
installed
that
is
capable
of
accommodating
a
25-year
storm
event
entirely
within
the
piping
system.
Thus,
the
Bay
Trail
and
Sierra
Point
Parkway
would
be
provided
with
protection
from
a
25-year
storm.
To
clarify
required
protection
levels,
Mitigation
Measure
4.H-4a
is
revised
to
read
as
follows.
Mitigation
Measure
4.H-4a:
Prior
to
issuance
of
a
building
permit,
all
site-specific
development
plans
within
the
Project
Site
shall
include
systemwide
drainage
improvements
that
shall
accommodate
all
increased
runoff
in
accordance
with
City
requirements
and
correct
known
existing
deficiencies
(e.g.,
Levinson
Overflow
Area
and
the
PG&E
property).
On-
site
storm
drainage
collection
facilities
shall
be
sized
to
convey
the
peak
flow
rate
from
a
25-year
storm
event
entirely
within
the
piping
system
such
that
Baylands
roadways
and
recreational
facilities
are
not
flooded.
Drainage
improvements
shall
accommodate
the
100-year
peak
storm
event
within
the
piping
system
and
within
streets
such
that
building
finished
floor
elevations
provide
a
minimum
of
1-foot
of
freeboard
above
the
100-year
storm
event
hydraulic
grade
line
water
elevation
with
tidal
flow
and
100
years
of
estimated
sea
level
rise.
Key
roadways
including
Sierra
Point
Parkway,
Lagoon
Road,
and
Tunnel
Avenue
shall
be
designed
such
that
these
roadways
are
available
as
evacuation
routes
in
the
event
of
a
100-year
storm
event.
The
proposed
system
design
shall
be
submitted
to
the
City
Engineer
for
approval
and
shall
hydraulically
isolate
existing
drainage
inlets
fronting
Levinson
Overflow
Area
and
the
PG&E
property
from
existing
Brick
Arch
Sewer
system.
Under
CEQA,
an
EIR
must
describe
a
reasonable
range
of
alternatives
to
a
proposed
project
that
would
feasibly
attain
most
of
the
project’s
basic
objectives
while
reducing
or
avoiding
any
of
its
significant
effects.
(CEQA
Guidelines
15126.6(a).)
A
lead
agency
is
not
required
to
consider
potential
alternatives
that
would
not
reduce
the
project’s
environmental
effects.
The
relocation
of
South
Visitacion
Park
would
not
reduce
or
avoid
any
significant
impacts
of
the
DSP
or
DSP-V
scenario
due
to
site
contamination,
since
remediation
of
such
contamination
is
a
prerequisite
for
site
development.
The
appropriateness
of
the
proposed
location
of
South
Visitacion
Park
will
be
considered
as
part
of
the
planning
review
being
undertaken
by
the
City
for
the
Baylands.
The
comment
raises
no
significant
environmental
issues
regarding
the
analyses
or
conclusions
of
the
Draft
EIR.
The
appropriate
location
for
the
community
garden
proposed
in
the
Brisbane
Brisbane
Baylands
Final
EIR
2.9.1-107
May
2015