BBCAG
BBCAG
comments
on
DEIR
23
January
2014
page
64
The
noise
from
Hwy
101,
the
rail
line,
Bayshore
Blvd
and
aircraft
in
this
area
will
be
very
high
and
will
cause
physical
and
mental
stress
reactions
especially
when
joined
with
the
stress
caused
by
greatly
deteriorated
traffic
and
air
quality
conditions.
The
climate
change
possibility
of
changes
in
the
prevailing
winds
will
further
deteriorate
air
quality.
The
area
is
surrounded
by
air
polluting
industrial
uses.
Subject:
Infrastructure
Plan,
Section
7.2.2.2
Secondary
Water
Supply
Sources,
p
.
51
Comment:
Secondary
water
supplies
"water
wheeling"
and/or
bay
water
desalination
would
face
significant
regulatory
hurdles
and
could
be
very
costly
when
compared
with
other
options.
We
tend
not
to
think
about
things
such
as
water
rates
skyrocketing
because
of
the
problems
pro-
viding
and
maintaining
infrastructure
on
the
Baylands.
Subject:
Infrastructure
Plan,
Section
4.3
Site
Designs
to
Accommodate
Anticipated
Settlement,
p.
l
7ff
Comment:
HDPE
fusion-welded
pipe
is
recommended
because
it
is
flexible
and
reduces
the
likelihood
of
pipes
shearing
off
How
much
does
it
reduce
that
likelihood?
Can
't
they
compact
the
soil
more
effectively?
The
DEIR
should
require
modeling
for
the
conditions
that
the
pipes
and
vault
connections
will
have
to
endure
to
see
if
they
are
going
to
last
more
than
a
short
time.
Subject:
Infrastructure
Plan,
Section
8.4
Phases
for
Wastewater
System
Construction,
p.
69
Comment:
Tt
does
not
sound
feasible
to
keep
the
existing
wastewater
system
running
over
a
long
phased
development
The
wastewater
system
should
be
changed
over
relatively
quickly.
There
is
an
inherent
risk
in
setting
up
a
temporary
connection
for
so
long
a
time
and
there
is
an
increased
possibility
of
an
upset
event
like
an
earthquake.
The
DEIR
should
require
timely
con-
struction
and
implementation
of
a
new
wastewater
system.
Subject:
Infrastructure
Plan,
Section
7.2
and
7.3,
water
pressure
zones
Comment:
The
DEIR
should
require
a
peer
review
analysis
of
the
proposed
solutions
to
the
wa-
ter
pressure
zone
problems
that
are
expected
and
those
that
already
exist
and
which
might
be
ex-
acerbated
by
the
new
uses,
tanks
(2)
and
pressure
relief
valves.
Subject:
Infrastructure
Plan,
water
and
wastewater
systems
Comment:
The
DEIR
should
require
that
all
system
elements,
both
water
and
wastewater,
that
have
the
potential
to
cause
environmental
damage,
should
be
equipped
with
sensors
to
detect
leaks.
Subject:
Infrastructure
Plan,
8.5,
master
utility
system
plan
i
5-151