4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Utilities,
Service
Systems,
and
Water
Supply
(cont.)
Engineer
that
sufficient
water
storage
is
available
and
has
been
connected
to
the
Project
Site’s
water
delivery
system.
Biological
resources
impacts
of
water
diversions
along
the
Tuolumne
River
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.O-1b:
Controlled
Releases
to
Recharge
Groundwater
in
Streamside
Meadows
and
Other
Alluvial
Deposits.
In
any
year
during
which
the
SFPUC
determines
that
controlled
releases
of
water
from
Hetch
Hetchy
Reservoir
are
required
to
sustain
existing
meadow
vegetation
within
the
Poopenaut
Valley,
Brisbane
shall
contribute
a
percentage
of
the
water
it
purchases
from
OID
to
the
SFPUC
to
augment
the
controlled
releases
from
Hetch
Hetchy
Reservoir.
The
City’s
contribution
shall
be
in
proportion
to
the
amount
of
water
required
for
controlled
releases
by
the
SFPUC
in
any
given
year
that
such
releases
are
needed,
and
shall
be
in
an
amount
sufficient
to
ensure
that
impacts
to
meadows
resulting
from
the
proposed
OID-Brisbane
water
transfer
are
reduced
to
less
than
significant.
Prior
to
the
City’s
approval
of
a
water
supply
agreement
with
OID,
the
formula
for
determining
Brisbane’s
required
contribution
to
the
SFPUC
shall
be
determined
in
consultation
with
the
SFPUC.
That
formula
shall
be
included
in
the
City’s
agreement
with
the
SFPUC
to
transport
and
store
the
water
purchased
from
OID.
SFPUC
Water
Supply
Agreement:
City
Council
The
City
shall
not
adopt
any
water
supply
agreement
that
does
not
meet
the
requirements
of
Mitigation
Measure
4.O-1b.
The
City
Engineer
shall
review
water
supply
agreement(s)
prior
to
submittal
to
the
City
Council
for
approval.
Water
supply
agreement(s)
that
provide
for
the
controlled
releases
specified
in
Mitigation
Measure
4.O-1b.
Energy
Resources
Energy
consumption.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.P-1:
During
all
Project
Site
construction
activities,
construction
contractors
shall
implement
the
following
measures
to
prevent
the
wasteful
or
inefficient
use
of
energy
during
construction:
Implement
work
schedules
and
procedures
that
minimize
equipment
idle
time
and
double-handling
of
material;
Minimize
equipment
idling
time
either
by
shutting
equipment
off
when
not
in
use
or
reducing
the
maximum
idling
time
to
5
minutes
(as
required
by
Construction
contractors
The
City
Building
Official
and
City
Engineer
shall
not
approve
any
grading
or
building
permit
applications
without
evidence
that
language
is
included
in
construction
contracts
and
specifications
to
require
implementation
of
the
provisions
of
Mitigation
Measure
4.P-1.
The
City
Building
Official
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
building
construction.
The
City
Engineer
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
grading
and
infrastructure
construction.
Approval
of
construction
permits
in
compliance
with
Mitigation
Measure
4.P-1.
Brisbane
Baylands
Final
EIR
4-98
May
2015