4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
Demand
for
loading
areas.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-17:
Each
site-specific
development
project
shall
Applicants
for
site-specific
provide
sufficient
loading
areas
in
appropriate
locations
development
projects.
such
that
loading
activities,
including
loading
vehicle
queuing,
will
not
block
roadway
or
onsite
parking
area
travel
lanes,
or
bicycle
or
pedestrian
facilities
.
City
of
Brisbane
Building
Official
The
Building
Official
shall
review
all
proposed
site
development
plans
to
set
requirements
for
the
number
of
loading
spaces
based
on
the
proposed
use
and
anticipated
levels
of
loading
activity.
The
Community
Development
Director
shall
review
all
proposed
site
development
plans
to
conform
that
the
proposed
location
and
design
of
loading
activities,
including
loading
vehicle
queuing,
will
not
block
roadway
or
onsite
parking
area
travel
lanes,
or
bicycle
or
pedestrian
facilities.
Approval
of
site-specific
development
by
the
City
in
compliance
with
Mitigation
Measure
4.N-17.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Utilities,
Service
Systems,
and
Water
Supply
Adequate
local
water
storage.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.O-1a:
The
City
shall
issue
building
permits
for
habitable
structures
only
after
it
determines
that
sufficient
water
storage
is
available
and
connected
to
the
Project
Site’s
water
delivery
system.
Water
storage
facilities
shall
be
constructed
either
by
the
Brisbane
Baylands
developer
or
by
the
City,
as
mutually
agreed.
Should
the
City
construct
facilities,
site-specific
development
projects
shall
reimburse
the
City
for
their
fair
share
of
costs,
as
determined
by
the
City
of
Brisbane
Public
Works
Department,
for
the
development
of
water
storage
to
provide
fire
flows
and
peak
daily
water
demands
to
serve
Project
Site
development.
Prior
to
issuance
of
the
first
permit
of
occupancy,
site-specific
development
projects
shall
verify
the
availability
of
adequate
water
storage
capacity
to
provide
fire
flows
and
meet
peak
daily
water
demands
to
serve
Project
Site
development.
Each
required
specific
plan
for
development
within
the
Project
Site
shall
include
this
mitigation
measure
as
a
requirement
for
future
development.
City
Engineer
The
Brisbane
City
Engineer
shall
be
responsible
for
ensuring
that
a
site
for
construction
of
water
storage
facilities
is
identified
and
facilities
have
been
designed,
all
environmental
studies
and
permits
for
such
construction
have
been
completed,
and
needed
water
storage
facilities
have
been
constructed
and
connected
to
the
City
water
system.
The
City
Building
Official
shall
not
issue
any
building
permits
for
habitable
structures
without
certification
by
the
City
The
City
Engineer
shall
inform
the
Community
Development
Director
and
City
Building
Official
when
construction
of
needed
water
storage
facilities
has
been
completed.
Issuance
of
building
permits
for
habitable
structures
in
compliance
with
Mitigation
Measure
4.O-1a.
Brisbane
Baylands
Final
EIR
4-97
May
2015