4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Energy
Resources
(cont.)
the
California
Airborne
Toxic
Control
Measure
Title
13,
Section
2485
of
California
Code
of
Regulations
[CCR]);
Switch
off
office
equipment
and
lights
when
not
in
use;
Use
solar
power
sources
for
road
signs
and
other
applicable
equipment
that
will
be
required
at
the
construction
site;
Design
all
temporary
roads
to
minimize
travel
distances;
and
Maintain
and
properly
tune
all
construction
equipment
in
accordance
with
manufacturer’s
specifications.
It
shall
be
the
contractor’s
responsibility
to
ensure
that
all
equipment
has
been
checked
by
a
certified
mechanic
and
determined
to
be
running
in
proper
condition
prior
to
operation.
Energy
consumption.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.P-2a:
All
new
buildings
within
the
Project
Site
subject
to
the
provisions
of
Brisbane
Municipal
Code
Section
15.80
shall
be
required
to
achieve
a
LEED
Gold
rating,
rather
than
the
LEED
Silver
rating
now
required
by
the
Municipal
Code.
In
addition,
all
appliances
installed
within
the
Project
Site
as
part
of
original
building
construction
shall
be
ENERGY
STAR
rated
or
equivalent.
Mitigation
Measure
4.P-2b:
All
street
and
parking
lot
lighting
within
the
Project
Site
shall
be
energy
efficient
light
emitting
diode
(LED)
based
lighting,
until
a
more
efficient
technology
for
street
and
parking
lot
lighting
acceptable
to
the
City
of
Brisbane
becomes
commercially
available,
at
which
time
all
street
and
parking
lot
lighting
shall
be
the
most
energy
efficient
technology
that
is
commercially
available
for
street
and
parking
lot
lighting
and
that
is
also
acceptable
to
the
City
of
Brisbane.
Applicants
for
building
permits
subject
to
the
provisions
of
Brisbane
Municipal
Code
Section
15.80.
City
of
Brisbane
Building
Official
Review
of
building
permit
applications
to
ensure
subject
to
the
provisions
of
Brisbane
Municipal
Code
Section
15.80
shall
be
required
to
achieve
a
LEED
Gold
rating.
Approval
of
building
permits
for
buildings
subject
to
the
provisions
of
Brisbane
Municipal
Code
Section
15.80
meeting
a
LEED
Gold
rating.
The
City
Engineer
shall
not
approve
authorize
commencement
of
infrastructure
improvement
construction
without
evidence
that
language
is
included
in
construction
contracts
and
specifications
to
require
implementation
of
the
provisions
of
Mitigation
Measure
4.P-1.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Energy
consumption.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Applicants
for
infrastructure
and/or
site-specific
development
requiring
provision
of
street
and/or
parking
lot
lighting.
Street
lighting:
City
Engineer
Parking
lot
lighting:
Community
Development
Director
The
City
Engineer
shall
review
street
improvement
plans
to
ensure
provision
of
street
lighting
per
Mitigation
Measure
4.P-2b.
Community
Development
Director
shall
review
shall
review
site
improvement
plans
to
ensure
provision
of
parking
lot
lighting
per
Mitigation
Measure
4.P-2b.
Approval
of
street
improvement
plans
in
compliance
with
Mitigation
Measure
4.P-2b.
Approval
of
site
improvement
plans
in
compliance
with
Mitigation
Measure
4.P-2b.
Brisbane
Baylands
Final
EIR
4-99
May
2015