4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
result
in
reducing
the
interchange
to
below
the
acceptable
LOS
standard.
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
Cumulative
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-3g:
Prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard,
signal
timing
settings
at
the
Carter
Street/Geneva
Avenue
intersection
shall
be
modified
by
the
City
and
County
of
San
Francisco
to
provide
longer
green
time
on
eastbound/westbound
permitted
movements
and
longer
cycle
length.
Baylands
developer
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
maintain
annual
traffic
counts
to
monitor
traffic
conditions,
and
shall
provide
for
traffic
analyses
of
site-specific
development
proposals
to
determine
when
the
requirements
of
Mitigation
Measure
4.N-3g
are
to
be
applied.
If
the
requirements
of
Mitigation
Measure
4.N-3g
apply
to
a
site-specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
shall
not
issue
occupancy
permits
for
the
development
until
notified
by
the
City
Engineer
that
the
requirements
of
Mitigation
Measure
4.N-3g
have
been
satisfied.
Because
the
required
improvements
are
outside
of
Brisbane,
permission
to
construct
the
improvements
called
for
in
Mitigation
Measure
4.N-3g
must
be
secured
from
the
City
and
County
of
San
Francisco.
The
City
Engineer
shall
work
with
the
applicant
to
secure
such
permission.
Installation
of
the
physical
improvements
required
by
Mitigation
Measure
4.N-3g
or
written
confirmation
from
San
Francisco
that
such
improvements
will
not
be
permitted
to
be
constructed.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-88
May
2015
Previous Next