4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
If
San
Francisco
agrees
to
the
improvements
called
for
in
Mitigation
Measure
4.N-3g,
the
City
Engineer
shall
inform
the
Brisbane
Building
Official
upon
completion
of
required
improvements
that
occupancy
permits
may
be
issued.
If
San
Francisco
does
not
agree
to
the
improvements
called
for
in
Mitigation
Measure
4.N-3g,
the
City
Engineer
shall
inform
the
Brisbane
Building
Official
that
occupancy
permits
may
be
issued
upon
written
confirmation
from
San
Francisco
that
such
improvements
will
not
be
permitted
to
be
constructed.
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
under
Cumulative
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Measure
4.N-3h:
A
traffic
signal
shall
be
installed
if
determined
to
be
safe
when
the
hour
signal
warrant
for
the
E.
Market
Street/Orange
Street
intersection
is
met
in
the
PM
peak
hour
.
Baylands
developer
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
maintain
annual
traffic
counts
to
monitor
traffic
conditions,
and
shall
provide
for
traffic
analyses
of
site-specific
development
proposals
to
determine
when
the
requirements
of
Mitigation
Measure
4.N-3h
are
to
be
applied.
If
the
requirements
of
Mitigation
Measure
4.N-3h
apply
to
a
site-specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
Installation
of
the
physical
improvements
required
by
Mitigation
Measure
4.N-3h
or
written
confirmation
from
Daly
City
that
such
improvements
will
not
be
permitted
to
be
constructed.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-89
May
2015