4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
Cumulative
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-3e:
A
traffic
signal
shall
be
installed
when
the
peak
Baylands
developer
hour
signal
warrant
is
met
in
either
the
AM
or
PM
peak
period.
In
addition,
the
Lagoon
Way/Sierra
Point
Parkway
intersection
shall
be
widened
and
intersection
approaches
shall
be
restriped
to
provide
two
through
lanes
and
one
right-turn
lane
in
the
southbound
direction,
one
through
lane
and
two
left-turn
lanes
in
the
northbound
direction,
and
two
left-turn
lanes
and
one
right-turn
lane
in
the
eastbound
direction.
Additional
road
widening
on
Lagoon
Road
&
Sierra
Point
Parkway
would
also
be
required.
The
signal
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-
specific
development
that
would
cause
signal
warrants
to
be
met
in
the
AM
or
PM
peak
hour.
The
other
improvements
cited
in
this
measure
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
4.N-3f:
The
City
of
Brisbane
shall
work
with
the
San
Francisco
County
Transportation
Authority
(SFCTA),
San
Francisco
Municipal
Transportation
Authority
(SFMTA),
and
Caltrans
to
ensure
that
projected
traffic
volumes
are
accounted
for
in
the
design
of
the
Geneva
Avenue
&
US
101
SB
Ramps
intersection
as
part
of
the
Geneva
Avenue
extension
project.
Mitigations
and
associated
fair-share
funding
measures
for
cumulative
regional
roadway
system
impacts
will
be
formulated
through
the
current
inter-
jurisdictional
Bi-County
Transportation
Study
effort
being
led
by
the
SFCTA.
Development
within
the
Project
Site
shall
contribute
its
fair
share
to
the
Geneva
Avenue
&
US
101
SB
Ramps
intersection
and
improvements.
The
extension
of
Geneva
Avenue
from
Bayshore
Boulevard
to
the
US
101
freeway
and
reconfiguration
of
the
US
101
Candlestick
interchange
shall
be
City
of
Brisbane
City
Engineer
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
Installation
of
the
physical
maintain
annual
traffic
improvements
required
by
counts
to
monitor
traffic
Mitigation
Measure
4.N-3e.
conditions,
and
shall
provide
for
traffic
analyses
of
site-specific
development
proposals
to
determine
when
the
requirements
of
Mitigation
Measure
4.N-3e
are
to
be
applied.
If
the
requirements
of
Mitigation
Measure
4.N-3e
are
apply
to
the
site-specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
shall
not
issue
occupancy
permits
for
the
development
until
notified
by
the
City
Engineer
that
the
required
improvements
have
been
completed.
The
City
Engineer
shall
provide
updated
information
on
the
approved
buildout
of
the
Baylands
to
the
SFCTA,
SFMTA,
and
Caltrans
to
ensure
that
projected
traffic
volumes
are
accounted
for
in
the
design
of
the
Geneva
Avenue
&
US
101
SB
Ramps
intersection
as
part
of
the
Geneva
Avenue
extension.
Once
mitigation
and
fair
share
funding
requirements
are
established,
the
City
Engineer
shall
include
such
requirements
as
conditions
of
approval
for
site-specific
development.
The
City
Engineer
shall
review
any
updates
to
the
Bi-County
Transportation
Study
effort
to
ensure
that
updated
information
on
the
approved
buildout
of
the
Baylands
is
reflected
in
the
update.
Issuance
of
building
permits
following
payment
of
applicable
mitigation
and
fair
share
funding
requirements
for
Bi-County
Transportation
Study
improvements.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
Cumulative
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Brisbane
Baylands
Final
EIR
4-87
May
2015