4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Traffic
and
Circulation
(cont.)
If
the
requirements
of
Mitigation
Measure
4.N-3c
are
apply
to
the
site-
specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
shall
not
issue
occupancy
permits
for
the
development
until
notified
by
the
City
Engineer
that
the
required
improvements
have
been
completed.
Increased
traffic
at
intersections
causing
them
to
operate
below
acceptable
levels
of
service
Cumulative
plus
Project
conditions.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.N-3d:
A
traffic
signal
shall
be
installed
when
the
peak
Baylands
developer
hour
signal
warrant
is
met
in
either
the
AM
or
PM
peak
period.
In
addition,
widening
and
restriping
of
the
intersection
approaches
to
provide
one
through
lane
and
one
left-turn
lane
in
the
southbound
direction,
one
through
lane
and
one
right-turn
lane
in
the
northbound
direction,
and
one
shared
left/through
and
one
right-
turn
lane
in
the
westbound
direction
shall
be
provided.
The
signal
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
cause
signal
warrants
to
be
met
in
the
AM
or
PM
peak
hour.
The
other
improvements
cited
in
this
measure
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
maintain
annual
traffic
counts
to
monitor
traffic
conditions,
and
shall
provide
for
traffic
analyses
of
site-specific
development
proposals
to
determine
when
the
requirements
of
Mitigation
Measure
4.N-3d
are
to
be
applied.
If
the
requirements
of
Mitigation
Measure
4.N-3d
are
apply
to
the
site-
specific
development,
the
City
Engineer
shall
inform
the
City
Building
Official,
who
shall
not
issue
occupancy
permits
for
the
development
until
notified
by
the
City
Engineer
that
the
required
improvements
have
been
completed.
Installation
of
the
physical
improvements
required
by
Mitigation
Measure
4.N-3d.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-86
May
2015
Previous Next