4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Noise
and
Vibration
(cont.)
Increases
in
ambient
noise
levels
from
onsite
wind
energy
generation.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.J-3b:
Small
wind
turbines
shall
be
sited
a
minimum
of
50
feet
from
the
property
line
of
noise
sensitive
land
uses
(e.g.,
residential,
schools,
religious
institutions).
Utility
scale
wind
turbines
shall
be
sited
a
minimum
of
100
feet
from
the
property
line
of
noise
sensitive
land
uses
and
separated
from
one
another
by
a
distance
no
less
than
a
minimum
of
two
times
the
rotor
diameter
of
the
larger
turbine.
4.J-4a:
All
applicants
for
site-specific
development
within
the
Project
Site
shall
implement
site-specific
noise
attenuation
measures
during
all
construction-
related
activities
under
the
supervision
of
a
qualified
acoustical
consultant
as
a
pre-requisite
to
issuance
of
site
grading(s).
These
measures
shall
be
included
in
a
Noise
Control
Plan
that
shall
be
submitted
for
review
and
approval
by
the
City
of
Brisbane
Building
Department
to
ensure
that
construction
noise
does
not
exceed
the
standards
set
forth
in
the
City’s
Noise
Ordinance.
These
attenuation
measures
shall
include
all
or
any
combination
of
the
following
control
strategies:
Limit
standard
construction
activities
to
between
7:00
a.m.
and
7:00
p.m.
Monday
through
Friday
and
between
9:00
a.m.
and
7:00
p.m.
on
weekends
and
holidays.
Pile
driving
and/or
other
extreme
noise-
generating
activities
(greater
than
90
dBA)
would
be
limited
to
between
8:00
a.m.
and
4:00
p.m.
Monday
through
Friday,
with
no
extreme
noise-generating
activity
permitted
between
12:30
p.m.
and
1:30
p.m.
No
extreme
noise-generating
activities
would
be
allowed
on
weekends
and
holidays;
Equipment
and
trucks
used
for
construction
shall
use
the
best
available
noise
control
techniques
(e.g.,
improved
mufflers,
equipment
redesign,
use
of
intake
silencers,
ducts,
engine
enclosures,
and
acoustically
attenuating
shields
or
shrouds;
Impact
tools
(e.g.,
jack
hammers,
pavement
breakers,
and
rock
drills)
used
for
construction
shall
be
hydraulically
or
electrically
powered
wherever
possible
to
avoid
noise
associated
with
compressed
Applicants
for
development
of
wind
turbines
Community
Development
Director
The
Community
Development
Department
shall
review
proposed
site-
specific
development
plans
prior
to
public
hearings
or
prior
to
approval
if
no
hearing
is
required.
The
Community
Development
Department
shall
review
proposed
site-
specific
development
plans
prior
to
public
hearings
or
prior
to
approval
if
no
hearing
is
required.
Approval
of
wind
turbine
development
in
compliance
with
Mitigation
Measure
4.J-
3b.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Construction
noise.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Applicants
for
site-specific
development
Community
Development
Director
Approval
of
site-specific
development
in
compliance
with
Mitigation
Measure
4.J-
4a.
Brisbane
Baylands
Final
EIR
4-72
May
2015