4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Noise
and
Vibration
(cont.)
Building
Official
shall
coordinate
with
the
affected
utility
to
establish
a
monitoring
schedule
for
repair
activities
and
methodology
for
determining
that
needed
repairs
are
completed.
Increases
in
ambient
4.J-3a:
All
development
within
the
Project
Site
shall
noise
levels
from
incorporate
the
following
design
features
into
the
final
stationary
and
mobile
site
plans
prior
to
issuance
of
a
building
permit:
operational
sources.
Building
equipment
(e.g.,
heating,
ventilation,
and
DSP,
DSP-V,
CPP,
&
air
conditioning
units)
shall
be
located
away
from
CPP-V
scenarios
nearby
residences,
on
building
rooftops,
or
adequately
shielded
within
an
enclosure
that
effectively
blocks
the
line
of
sight
of
the
source
from
receivers
in
order
to
meet
a
performance
standard
of
5
dBA
over
existing
ambient
noise
levels
(generally
perceptible
increase
to
most
persons)
for
this
source
which
would
potentially
operate
more
than
20
minutes
in
a
given
hour.
Formal
truck
delivery
areas
(e.g.
loading
bays)
shall
be
located
at
least
100
feet
from
residences
to
maintain
noise
levels
of
less
than
5
dBA
over
existing
monitored
levels,
except
within
mixed-use
buildings
containing
both
residential
and
commercial
uses.
Truck
delivery
bays
and
waste
collection
areas
shall
be
located
so
that
they
are
blocked
by
Project
buildings
or
designed
with
noise
reduction
barriers
to
reduce
noise
impacts
on
residences
or
other
sensitive
receptors.
Where
truck
delivery
bays
are
provided
within
mixed-use
buildings
containing
both
residential
and
commercial
uses,
they
shall
be
located
and
designed
so
as
to
minimize
the
effects
of
noise
from
loading
activities
on
residential
uses
within
the
building.
Applicants
for
site-specific
development
Community
Development
Director
The
Community
Development
Department
shall
review
proposed
site-
specific
development
plans
prior
to
public
hearings
or
prior
to
approval
if
no
hearing
is
required.
Approval
of
site-specific
developments
in
compliance
with
Mitigation
Measure
4.J-3a.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-71
May
2015
Previous Next