4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Noise
and
Vibration
(cont.)
air
exhaust
from
pneumatically
powered
tools.
Where
use
of
pneumatic
tools
is
unavoidable,
an
exhaust
muffler
on
the
compressed
air
exhaust
shall
be
used;
this
muffler
can
lower
noise
levels
from
the
exhaust
by
up
to
about
10
dBA.
External
jackets
on
the
tools
themselves
shall
be
used
where
feasible;
this
could
achieve
a
reduction
of
5
dBA.
Quieter
procedures,
such
as
use
of
drills
rather
than
impact
tools,
shall
be
used;
Stationary
noise
sources
shall
be
located
as
far
as
possible
from
adjacent
receptors,
and
they
shall
be
muffled
and
enclosed
within
temporary
sheds,
incorporate
insulation
barriers,
or
include
other
measures;
Erect
temporary
plywood
noise
barriers
around
the
construction
site
when
adjacent
occupied
sensitive
land
uses
are
present
within
75
feet;
Implement
“quiet”
pile-driving
technology
(such
as
pre-drilling
of
piles
and
the
use
of
more
than
one
pile
driver
to
shorten
the
total
pile
driving
duration),
where
feasible,
in
consideration
of
geotechnical
and
structural
requirements
and
conditions;
Use
noise
control
blankets
on
building
structures
as
buildings
are
erected
to
reduce
noise
emission
from
the
site;
and
Use
cushion
blocks
to
dampen
impact
noise.
Construction
noise.
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.J-4b:
Prior
to
City
issuance
of
grading
permits,
applicants
for
site-specific
development
projects
within
the
Project
Site
shall
submit
to
the
Brisbane
Building
Department,
a
list
of
measures
that
will
be
undertaken
to
respond
to
and
track
complaints
pertaining
to
construction
noise,
including:
A
procedure
for
notifying
the
Building
Department
staff
of
complaints;
A
plan
for
posting
onsite
signs
pertaining
to
permitted
construction
days
and
hours,
complaint
procedures,
and
the
contact
person
who
should
be
notified
in
the
event
of
a
problem;
Applicants
for
site-specific
development
Community
Development
Director
The
Community
Development
Department
shall
review
the
measures
proposed
by
applicants
for
site-specific
development
projects.
The
City
Building
Official
shall
not
issue
a
grading
permit
until
given
clearance
by
the
Community
Development
Director
that
the
required
Approval
of
site-specific
development
in
compliance
with
Mitigation
Measure
4.J-
4a.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-73
May
2015