4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Geology,
Soils,
and
Seismicity
(cont.)
landfill
closure
requirements
as
approved
by
the
RWQCB
and
the
San
Mateo
County
Department
of
Environmental
Health
prior
to
issuance
of
a
building
permit.
The
plan
shall
be
implemented
in
the
event
of
a
magnitude
7.0
or
greater
earthquake
centered
within
30
miles
of
the
former
Brisbane
Landfill.
Results
of
the
inspection
of
containment
features
and
groundwater
and
leachate
control
facilities
potentially
affected
by
any
static
or
seismic
deformations
of
the
landfill
shall
be
reported
to
the
RWQCB
within
72
hours
of
the
event.
Immediately
following
an
earthquake
event
causing
damage
to
the
landfill
structures,
the
Plan
shall
be
implemented
and
the
RWQCB
notified
of
any
damage.
Plan
activities
following
a
triggering
event
shall
include
assessing
perimeter
dikes
and
shoreline
erosion
protection
measures,
the
surface
locations
of
underground
utilities,
landfill
cover
including
roads
and
parking
areas,
groundwater
monitoring
systems,
leachate
monitoring
systems,
and
surface-water
drainage
and
outlet
facilities.
Any
restorative
measures
as
required
under
Order
01-041
shall
be
implemented
in
accordance
with
RWQCB
requirements.
Seismic
related
ground
failure
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.E-3:
The
final
design-level
geotechnical
investigation
recommended
in
Mitigation
Measure
4.E-2a
above,
to
be
prepared
by
a
licensed
professional
and
submitted
to
the
City
for
review
and
approval,
shall
address
liquefaction
potential.
The
geotechnical
investigation
shall
include
recommendations
for
foundation
design
to
address
site-specific
potential
liquefaction
issues.
The
recommendations
of
the
investigation
shall
be
in
accordance
with
the
most
recent
California
Building
Code
requirements
for
building
design
and
incorporated
into
all
development
plans
submitted
for
the
Project
Site
development.
All
final
design
and
engineering
plans
submitted
by
the
applicant
shall
be
subject
to
review
and
approval
by
the
City
of
Brisbane
Building
Official.
Applicant(s)
for
grading
permit(s)
and
site-specific
development
City
of
Brisbane
City
Engineer
for
grading
or
infrastructure
construction.
City
of
Brisbane
Building
Official
for
building
construction.
San
Mateo
County
Health
System
have
approved
a
Post-Earthquake
Inspection
and
Corrective
Action
Plan
in
accordance
with
Title
27
landfill
closure
requirements
and
the
provisions
of
Mitigation
Measure
4.E-2b.
The
City
Engineer
shall
review
all
required
design-
level
geotechnical
reports
prior
to
approval
of
any
grading
or
infrastructure
construction
permit.
The
Building
Official
shall
review
all
required
design-
level
geotechnical
reports
prior
to
approval
of
any
grading
or
construction
permit.
Approval
of
grading
or
construction
permits
that
construction
plans
are
in
accordance
with
the
recommendations
of
required
design-level
geotechnical
reports
and
applicable
California
Building
Code
requirements.
Brisbane
Baylands
Final
EIR
4-45
May
2015