4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Geology,
Soils,
and
Seismicity
(cont.)
Slope
stability
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.E-4a:
Site-specific
development
projects
within
the
Project
Site
shall
not
place
new
fill
materials
within
600
feet
of
Brisbane
Lagoon,
except
when
required
for
roadway
improvements,
habitat
enhancement,
or
other
approved
site
improvements.
Placement
of
new
fill
materials
within
600
feet
of
the
Brisbane
Lagoon
shall
be
designed
to
prevent
erosion
of
soils
into
the
lagoon
during
and
subsequent
to
construction.
All
manufactured
slopes
shall
require
certification
by
a
licensed
geotechnical
engineer
to
the
satisfaction
of
the
City
Engineer
that
a
factor
of
safety
of
at
least
1.5
for
static
conditions
and
1.2
under
dynamic
conditions
will
be
achieved.
4.E-4b:
Site-specific
development
projects
within
the
Project
Site
shall
comply
with
Brisbane
General
Plan
policy
requirements
and
the
most
recent
California
Building
Code
requirements
for
slope
stability,
including
Chapters
16
and
18
that
require
geotechnical
investigations.
The
recommendations
of
the
investigation
shall
be
in
accordance
with
the
most
recent
California
Building
Code
requirements
for
building
design
and
incorporated
into
all
development
plans
submitted
for
Project
Site
development.
All
final
design
and
engineering
plans
submitted
by
the
Project
applicant
shall
be
subject
to
review
and
approval
by
the
City
of
Brisbane
Building
Official
prior
to
issuance
of
a
building
permit.
Applicant(s)
for
grading
permit(s)
within
600
feet
of
the
Brisbane
Lagoon
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
review
all
required
design-
level
geotechnical
reports
prior
to
approval
of
any
grading
permit.
The
City
Engineer
shall
monitor
grading
within
600
feet
of
the
lagoon
on
a
minimum
monthly
basis.
Approved
grading
permits
that
grading
in
compliance
with
Mitigation
Measure
4.E-4a.
Slope
stability
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Applicant(s)
for
grading
permit(s)
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
review
all
required
design-
level
geotechnical
reports
prior
to
approval
of
any
grading
permit.
Approval
of
grading
permits
that
in
accordance
with
the
recommendations
of
required
geotechnical
reports
and
the
California
Building
Code.
Hazards
and
Hazardous
Materials
Routine
use,
storage,
transport,
and
disposal
of
hazardous
materials
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.G-2a
(Confirm
Achievement
of
Remediation
Goals):
Prior
to
approval
of
a
specific
plan
for
any
parcel
within
the
Project
Site,
the
project
applicant
shall
provide
confirmation
to
the
City
that
the
Department
of
Toxic
Substances
Control
(DTSC),
Regional
Water
Quality
Control
Board
(RWQCB),
and/or
the
San
Mateo
County
Environmental
Health
Division
as
the
Local
Enforcement
Agency,
as
applicable,
have
completed
their
review
and
accepted
the
Remedial
Action
Plan
or
final
closure
and
post-
closure
maintenance
plans.
Responsible
parties
for
site
remediation
and
Title
27
landfill
closure
City
of
Brisbane
Community
Development
Director
The
City
Council
shall
not
approve
any
specific
plan
for
land
within
OU-
2,
or
the
former
landfill
until
DTSC,
RWQCB,
and/or
the
San
Mateo
County
Environmental
Health
Division
as
the
Local
Enforcement
Agency,
as
applicable,
have
completed
their
review
and
accepted
the
Approval
of
specific
plan(s),
site-specific
development,
and
grading
and
building
permits
in
compliance
with
Mitigation
Measure
4.G-2a.
Brisbane
Baylands
Final
EIR
4-46
May
2015