4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Geology,
Soils,
and
Seismicity
(cont.)
specific
construction
methods
and
recommendations
regarding
grading
activities,
fill
placement,
soil
corrosivity/expansion/erosion
potential,
compaction,
foundation
construction,
drainage
control
(both
surface
and
subsurface),
and
avoidance
of
settlement,
liquefaction,
differential
settlement,
spread
of
leachate
outside
of
the
former
landfill,
and
seismic
hazards
in
accordance
with
current
California
Building
Code
requirements
including
Chapter
16,
Section
1613.
The
report
shall
also
require
that
all
subsurface
improvements
such
as
utilities
that
include
any
materials
susceptible
to
corrosive
effects
would
be
engineered
in
conformance
with
the
most
recently
adopted
California
Building
Code
requirements
including
the
use
of
engineered
backfill.
The
report
shall
also
include
stability
analyses
of
final
design
cut
and
fill
slopes,
including
recommendations
for
avoidance
of
slope
failure(s).
The
final
grading
plan
and
associated
development
elements
including
the
landfill
cap
layer
shall
be
designed
and
constructed
in
accordance
with
requirements
of
the
final
design-level
geotechnical
investigation
as
approved
by
the
City
Engineer
prior
to
the
issuance
of
any
building
permits.
Designers
and
contractors
shall
comply
with
recommendations
of
the
design-level
geotechnical
investigation
during
project
construction
including
any
modifications
required
by
the
City
Engineer.
A
licensed
geotechnical
or
soil
engineer
shall
monitor
earthwork
and
construction
activities
to
ensure
that
recommended
site-specific
construction
methods
are
followed
during
Project
construction.
These
recommendations
shall
be
incorporated
into
all
development
plans
submitted
and
approved
for
the
Project
Site
development
as
conditions
of
approval.
Exposure
of
people
and
structures
to
strong
seismic
groundshaking
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.E-2b:
To
address
recovery
from
damage
to
future
structures
and
to
the
landfill
itself
that
may
be
caused
by
future
earthquakes,
a
Post-Earthquake
Inspection
and
Corrective
Action
Plan
(Plan)
for
the
site-specific
development
projects
within
the
former
landfill
portion
of
the
Project
Site
shall
be
prepared
and
implemented
by
all
Project
applicants
in
accordance
with
Title
27
Responsible
party
for
Title
27
landfill
closure
RWQCB
and
the
San
Mateo
Prior
to
approval
of
any
County
Health
System
grading
or
construction
plan
within
the
former
landfill
area,
the
City
Engineer
or
Building
Official,
as
applicable,
shall
confirm
that
the
RWQCB
and
the
Approval
of
a
Post-
Earthquake
Inspection
and
Corrective
Action
Plan
by
the
RWQCB
and
the
San
Mateo
County
Health
System
Brisbane
Baylands
Final
EIR
4-44
May
2015