4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Cultural
Resources
(cont.)
by
the
City-approved
qualifying
archaeological
consultant.
Work
may
commence
upon
completion
of
treatment,
as
approved
by
the
City.
Potential
to
uncover
human
remains,
including
those
interred
outside
of
formal
cemeteries
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.D-4:
If
human
skeletal
remains
are
uncovered
during
Project
construction,
work
shall
immediately
be
halted
within
100
feet
of
the
find
and
the
San
Mateo
County
Coroner
shall
be
contacted
to
evaluate
the
remains
as
required
by
the
protocols
set
forth
in
Section
15064.5(e)(1)
of
the
CEQA
Guidelines.
If
the
County
Coroner
determines
that
the
remains
are
Native
American,
the
coroner
has
24
hours
to
contact
the
Native
American
Heritage
Commission
(NAHC),
in
accordance
with
Health
and
Safety
Code
Section
7050.5,
subdivision
(c),
and
Public
Resources
Code
Section
5097.98
(as
amended
by
Assembly
Bill
2641).
The
NAHC
will
then
identify
the
person(s)
thought
to
be
the
Most
Likely
Descendent
(MLD)
of
the
deceased
Native
American,
who
will
then
help
determine
what
course
of
action
should
be
taken
in
dealing
with
the
remains.
In
accordance
with
Public
Resources
Code
Section
5097.98,
the
specific
project
applicant/landowner
shall
ensure
that,
according
to
generally
accepted
cultural
or
archaeological
standards
or
practices,
the
immediate
vicinity
where
the
Native
American
human
remains
are
located
is
not
damaged
or
disturbed
by
further
development
activity
until
the
landowner
has
discussed
and
conferred,
as
prescribed
in
Public
Resources
Code
Section
5097.98,
with
the
MLD
regarding
their
recommendations,
if
applicable,
taking
into
account
the
possibility
of
multiple
human
remains.
Grading
and
construction
contractors
City
Engineer
Grading
and
construction
contractors
shall
provide
the
City
Engineer
with
a
monthly
certification
that
either
(1)
no
human
skeletal
remains
were
discovered
during
ground-
disturbing
activities
or
(2)
the
status
of
work
within
100
feet
of
the
discovery
of
human
skeletal
remains.
Monthly
documentation
that
the
provisions
of
Mitigation
Measure
4.D-4
are
being
implemented
during
ground-
disturbing
development
activities.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Geology,
Soils,
and
Seismicity
Exposure
of
people
and
structures
to
strong
seismic
groundshaking
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.E-2a:
Prior
to
the
issuance
of
a
grading
permit,
applicants
for
all
site-specific
development
and
infrastructure
projects
within
the
Project
Site,
including
structures,
utilities,
and
roadways
shall
submit
to
the
City
Engineer
a
final
design-level
geotechnical
report
prepared
by
a
licensed
geotechnical
or
soil
engineer
experienced
in
construction
methods
on
fill
materials
in
an
active
seismic
area.
The
report
shall
provide
site-
Applicant(s)
for
grading
permit(s)
and
site-specific
development
City
of
Brisbane
City
Engineer
The
City
Engineer
shall
review
all
required
design-
level
geotechnical
reports
prior
to
approval
of
any
grading
or
construction
permit.
Approval
of
grading
or
construction
permits
in
accordance
with
the
recommendations
of
required
design-level
geotechnical
reports
and
applicable
California
Building
Code
requirements.
Brisbane
Baylands
Final
EIR
4-43
May
2015