4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Cultural
Resources
(cont.)
Potential
impacts
on
previously
unidentified
archaeological
resources
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.D-2:
If
any
previously
unidentified
archaeological
Grading
and
construction
resources
are
discovered
during
ground-disturbing
contractors
activities
associated
with
development
on
the
Baylands,
all
work
within
100
feet
of
the
resources
shall
be
halted.
The
City,
in
consultation
with
a
City-
approved
qualified
consulting
archaeologist,
shall
assess
the
significance
of
the
find
according
to
CEQA
Guidelines
Section
15064.5.
Prehistoric
materials
subject
to
this
measure
might
include
obsidian
and
chert
flaked-stone
tools
(e.g.,
projectile
points,
knives,
scrapers)
or
toolmaking
debris;
culturally
darkened
soil
(“midden”)
containing
heat-affected
rocks,
artifacts,
or
shellfish
remains;
stone
milling
equipment
(e.g.,
mortars,
pestles,
handstones,
or
milling
slabs);
and
battered
stone
tools,
such
as
hammerstones
and
pitted
stones.
Historic-era
materials
subject
to
this
measure
might
include
in-situ
(in
place)
stone,
concrete,
or
adobe
footings
and
walls;
filled
wells
or
privies;
and
in-
situ
deposits
of
metal,
glass,
and/or
ceramic
refuse.
If
any
find
is
determined
to
be
a
historical
resource
or
a
unique
archaeological
resource,
the
City
and
the
consulting
archaeologist
shall
meet
to
determine
the
appropriate
avoidance
measures
or
other
appropriate
mitigation.
The
City
shall
make
the
final
determination.
All
archaeological
resources
recovered
shall
be
subject
to
scientific
analysis,
professional
museum
curation,
and
documentation
according
to
current
professional
standards.
Preservation
in
place,
i.e.
avoidance,
is
the
preferred
method
of
mitigation
for
impacts
to
cultural
resources
and
shall
be
required
unless
there
are
other
equally
effective
methods.
Preservation
in
place
would
include
planning
construction
to
avoid
archaeological
sites;
deeding
archaeological
sites
into
a
conservation
easement,
park,
or
green
space;
or
capping/covering
archaeological
sites
with
a
layer
of
soil
before
building.
Other
methods
to
be
considered
shall
include
archeological
testing,
archeological
monitoring,
and/or
an
archeological
data
recovery
program
that
would
include
sample
excavation,
artifact
collection,
site
documentation,
and
historical
research.
All
archaeological
work
shall
be
completed
in
accordance
with
a
Cultural
Resources
Management
Plan
prepared
City
Engineer
Grading
and
construction
contractors
shall
provide
the
City
Engineer
with
a
monthly
certification
that
either
(1)
no
previously
unidentified
archaeological
resources
were
discovered
during
ground-disturbing
activities
or
(2)
the
status
of
work
within
100
feet
of
the
discovery
of
previously
unidentified
archaeological
resources.
Monthly
documentation
that
the
provisions
of
Mitigation
Measure
4.D-2
are
being
implemented
during
ground-
disturbing
development
activities.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-42
May
2015
Previous Next