4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Biological
Resources
(cont.)
development
or
in
coordination
with
permit
applications
and/or
conditions.
Alternately,
offsite
mitigation
may
be
pursued
through
an
approved
mitigation
bank,
although
this
option
may
result
in
a
higher
ratio
for
compensation.
At
a
minimum,
such
plans
shall
include:
Baseline
information,
including
a
summary
of
findings
for
the
most
recent
wetland
delineation
conducted
at
the
Project
Site;
Anticipated
habitat
enhancements
to
be
achieved
through
compensatory
actions,
including
mitigation
site
location
(onsite
enhancement
or
offsite
habitat
creation)
and
hydrology;
Performance
and
success
criteria
for
wetland
creation
or
enhancement
including,
but
not
limited
to,
the
following:
-
At
least
90
percent
survival
of
installed
plants
for
each
of
the
first
three
years
following
planting.
-
Performance
criteria
for
vegetation
percent
cover
in
Years
1-4
as
follows:
at
least
10
percent
cover
of
installed
plants
in
Year
1;
at
least
20
percent
cover
in
Year
2;
at
least
30
percent
cover
in
Year
3;
at
least
40
percent
cover
in
Year
4;
and
at
least
50
percent
cover
in
Year
5.
-
Performance
criteria
for
hydrology
in
Years
1-5
as
follows:
14
or
more
consecutive
days
of
flooding,
ponding,
or
a
water
table
12
inches
or
less
below
the
soil
surface
during
the
growing
season
at
a
minimum
frequency
of
three
of
the
five
monitoring
years;
OR
establishment
of
a
prevalence
of
wetland
obligate
plant
species.
-
Invasive
plant
species
that
threaten
the
success
of
created
or
enhanced
wetlands
should
not
contribute
relative
cover
greater
than
35
percent
in
Year
1,
20
percent
in
Years
2
and
3,
15
percent
in
Year
4,
and
10
percent
in
Year
5.
-
If
necessary,
supplemental
water
shall
be
provided
by
a
water
truck
for
the
first
two
years
following
installation.
Any
supplemental
water
Engineer
shall
not
issue
a
permit
for
grading
or
other
ground
disturbing
activities
until
the
mitigation
has
been
completed
to
the
satisfaction
of
the
Community
Development
Director.
The
Community
Development
Director
shall
retain
a
qualified
biologist
to
(1)
conduct
annual
monitoring
and
reporting
as
to
whether
habitat
restoration
and
enhancement
areas
are
meeting
the
performance
standards
set
forth
in
Mitigation
Measure
4.C-1a
and
(2)
conduct
a
wetland
delineation
five
years
after
any
wetland
creation
or
restoration
to
determine
whether
such
wetlands
are
developing
according
to
the
success
criteria
outlined
in
regulatory
permits
and
Mitigation
Measure
4.C-2c.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-30
May
2015
Previous Next