4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Biological
Resources
(cont.)
monitoring
in
the
field
shall
be
maintained
to
ensure
compliance
with
the
provisions
of
Mitigation
Measure
4.C-2a.
Adverse
effects
on
riparian
habitat
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.C-2b:
The
measures
described
below
shall
be
employed
to
avoid
degradation
of
natural
communities
or
sensitive
natural
communities
by
maintaining
water
quality
and
controlling
erosion
and
sedimentation
during
construction
as
required
by
compliance
with
the
National
Pollutant
Discharge
Elimination
System
(NPDES)
General
Permit
for
Construction
Activities
and
as
established
by
Mitigation
Measures
4.H-1a
and
4.H-1b
(see
Section
4.H,
Hydrology
and
Water
Quality
,
of
this
EIR)
to
address
impacts
on
water
quality.
In
addition,
measures
shall
include,
but
not
be
limited
to,
the
following:
Installing
silt
fencing
between
aquatic
sensitive
natural
communities
and
Project-related
activities;
Locating
fueling
stations
away
from
potentially
jurisdictional
areas
and
features;
and
Otherwise
isolating
construction
work
areas
from
any
identified
jurisdictional
features.
Applicants
for
grading
and
site-specific
development
City
of
Brisbane
City
Engineer
Prior
to
commencement
of
grading
or
other
ground-
disturbing
activities,
the
City
Engineer
shall
confirm
in
the
field
that
required
fencing
is
in
place
and
that
construction
fueling
and
staging
areas
are
located
in
compliance
with
the
provisions
of
Mitigation
Measure
4.C-2b.
Minimum
monthly
monitoring
in
the
field
shall
be
maintained
to
ensure
ongoing
compliance
with
the
National
Pollutant
Discharge
Elimination
System
(NPDES)
General
Permit
for
Construction
Activities
and
as
established
by
Mitigation
Measures
4.C-1a,
4.H-1a,
and
4.H-1b.
In
reviewing
the
required
mitigation
plan
for
compliance
with
the
provisions
of
Mitigation
Measure
4.C-2a,
preference
shall
be
given
to
onsite
habitat
preservation
and
enhancement
over
offsite
in-kind
replacement.
The
shall
not
approve
site-
specific
development
projects
and
the
City
Issuance
of
permits
for
grading
and
other
ground
disturbing
activities
in
compliance
with
Mitigation
Measure
4.C-2b.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Adverse
effects
on
riparian
habitat
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.C-2c:
Where
disturbance
to
sensitive
natural
communities
cannot
be
avoided,
compensation
shall
be
provided
for
temporary
impacts
and
permanent
loss
to
ensure
that
there
is
no
overall
loss
of
sensitive
natural
communities
as
a
result
of
Project
Site
development.
Onsite,
in
kind
replacement
of
sensitive
natural
communities
including
coastal
scrub,
willow
scrub,
tidal
marsh,
freshwater
emergent
wetlands,
and
lined
manmade
drainages
that
have
developed
bed
and
bank
characteristics
shall
be
a
condition
of
development.
Compensation
shall
be
detailed
on
an
impact-specific
basis
and
shall
include
development
of
an
onsite
wetland
mitigation
and
monitoring
plan,
which
shall
be
developed
prior
to
Project
Site
Baylands
developer
City
of
Brisbane
Community
Development
Director
Issuance
of
permits
for
grading
and
other
ground
disturbing
activities,
along
with
approval
of
site-specific
development
projects
in
compliance
with
Mitigation
Measure
4.C-2c.
Brisbane
Baylands
Final
EIR
4-29
May
2015