4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Air
Quality
(cont.)
Generate
cumulatively
considerable
construction
emissions
of
criteria
pollutants
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.B-2a:
To
reduce
construction
vehicle
emissions,
the
following
provisions
shall
be
incorporated
into
construction
specifications
for
all
projects
on
the
Baylands:
i.
Idling
times
shall
be
minimized
either
by
shutting
diesel-powered
or
gasoline-powered
equipment
off
when
not
in
use
or
reducing
the
maximum
idling
time
of
diesel-powered
equipment
to
five
minutes
(as
required
by
the
California
airborne
toxics
control
measure
Title
13,
Section
2485
of
California
Code
of
Regulations
[CCR]).
Clear
signage
shall
be
provided
for
construction
workers
at
all
access
points.
ii.
All
construction
equipment
shall
be
maintained
and
properly
tuned
in
accordance
with
manufacturer’s
specifications.
It
shall
be
the
contractor’s
responsibility
to
ensure
that
all
equipment
has
been
checked
by
a
certified
mechanic
and
determined
to
be
running
in
proper
condition
prior
to
operation.
iii.
All
construction
contract
specifications
shall
include
a
requirement
that
on-road
diesel
trucks
used
to
transport
spoils
consist
of
2007
or
newer
model-year
trucks
with
factory
built
engines.
All
on-road
diesel
trucks
shall
be
required
to
have
emission
control
labels
as
specified
in
13
CCR
2183(c)
or
any
subsequent
updates
to
this
CARB
regulation,
whichever
is
more
stringent.
The
construction
contract
specifications
shall
require
that
the
contractor
submit
to
the
City
a
comprehensive
inventory
of
all
on-road
trucks
used
to
haul
spoils.
The
inventory
shall
include
each
vehicle’s
license
plate
number,
the
engine
production
year,
and
a
notation
of
whether
the
truck
is
in
possession
of
an
emission
control
label
as
defined
in
13
CCR.
The
contractor
shall
update
the
inventory
and
submit
it
monthly
to
the
City
throughout
the
duration
of
the
project.
Construction
contractors
for
site-specific
development
The
City
Building
Official
shall
not
approve
any
building
permit
applications
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
The
City
Engineer
shall
not
approve
any
grading
permit
or
infrastructure
improvements
plan
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
The
City
Building
Official
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
building
construction.
The
City
Engineer
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
grading
and
infrastructure
construction.
Approval
of
building,
grading,
and
construction
permits
in
compliance
with
Mitigation
Measure
4.B-2a.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-13
May
2015
Previous Next