4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Air
Quality
(cont.)
2.
All
haul
trucks
transporting
soil,
sand,
or
other
loose
material
off-site
shall
be
covered.
3.
All
visible
mud
or
dirt
track-out
onto
adjacent
public
roads
shall
be
removed
using
wet
power
vacuum
street
sweepers
at
least
once
per
day.
The
use
of
dry
power
sweeping
is
prohibited.
4.
All
vehicle
speeds
on
unpaved
roads
shall
be
limited
to
15
mph.
5.
All
roadways,
driveways,
and
sidewalks
to
be
paved
shall
be
completed
as
soon
as
possible.
Building
pads
shall
be
laid
as
soon
as
possible
after
grading
unless
seeding
or
soil
binders
are
used.
6.
Idling
times
shall
be
minimized
either
by
shutting
equipment
off
when
not
in
use
or
reducing
the
maximum
idling
time
to
5
minutes
(as
required
by
the
California
airborne
toxics
control
measure
Title
13,
Section
2485
of
California
Code
of
Regulations).
Clear
signage
shall
be
provided
for
construction
workers
at
all
access
points.
7.
All
construction
equipment
shall
be
maintained
and
properly
tuned
in
accordance
with
manufacturer’s
specifications.
All
equipment
shall
be
checked
by
a
certified
mechanic
and
determined
to
be
running
in
proper
condition
prior
to
operation.
8.
A
publicly
visible
sign
shall
be
posted
with
the
telephone
number
and
person
to
contact
at
the
Lead
Agency
regarding
dust
complaints.
This
person
shall
respond
and
take
corrective
action
within
48
hours.
BAAQMD’s
phone
number
shall
also
be
visible
to
ensure
compliance
with
applicable
regulations.
9.
Construction
foreman
and
crew
shall
receive
training
from
contractors
on
implementation
of
the
above
emission
reduction
techniques
prior
to
each
development
phase.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Brisbane
Baylands
Final
EIR
4-12
May
2015