4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Air
Quality
(cont.)
Generate
cumulatively
considerable
construction
emissions
of
criteria
pollutants
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.B-2b:
All
construction
contract
specifications
shall
include
a
requirement
that
off-road
construction
equipment
used
for
site
improvements
shall
be
equipped
with
Tier
3
(Tier
2
if
greater
than
750
hp)
diesel
engines
or
better.
All
diesel
generators
used
for
project
construction
must
meet
Tier
4
emissions
standards.
If
new
emissions
standards
are
adopted
by
U.S.
EPA
during
project
construction,
construction
contract
specifications
shall
incorporate
whichever
standard
is
more
stringent.
Construction
contractors
for
site-specific
development
The
City
Building
Official
shall
not
approve
any
building
permit
applications
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
The
City
Engineer
shall
not
approve
any
grading
permit
or
infrastructure
improvements
plan
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
Businesses
with
100
or
more
employees
shall
provide
free
transit
passes
(e.g.,
Clipper
Card
for
use
on
Caltrain,
San
Francisco
Municipal
Railway
[Muni],
and
SAMTrans)
to
employees
as
part
of
approved
TDM
programs.
Site
developers
shall
design
parking
areas
with
a
minimum
of
20
spaces
for
commercial
and
industrial
uses
to:
Provide
a
minimum
of
1
secure
bicycle
parking
space
for
each
20
vehicle
parking
spaces.
Building
owners
responsible
for
maintaining
areas
shall
also
be
responsible
for
maintaining
secure
bicycle
parking
spaces.
City
of
Brisbane
Community
Development
Director
The
City
Building
Official
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
building
construction.
The
City
Engineer
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
grading
and
infrastructure
construction.
Approval
of
building,
grading,
and
construction
permits
in
compliance
with
Mitigation
Measure
4.B-2a.
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Considerable
net
increase
of
criteria
pollutants
during
operations
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.B-4:
The
following
measures
identified
in
the
2012
BAAQMD
CEQA
Guidelines
shall
be
implemented
for
site-specific
development
projects
within
the
Project
Site
and
shall
be
included,
as
applicable,
into
commercial
leases,
as
well
as
Covenants,
Codes,
and
Restrictions
(CC&Rs)
within
the
Project
Site:
(i)
Provide
free
transit
passes
(e.g.,
Clipper
Card
for
use
on
Caltrain,
San
Francisco
Municipal
Railway
[Muni],
and
SAMTrans)
to
employees
(for
employers
of
100
or
more
employees);
Provide
and
maintain
secure
bike
parking
for
commercial
and
industrial
uses
(at
least
one
space
per
20
vehicle
spaces)
as
a
condition
of
occupancy
permit/tenancy
contract;
The
Community
Development
Director
shall
ensure
that
provisions
i
through
vi
of
Mitigation
Measure
4.B-4
are
included
in
the
Transportation
Demand
Management
Program
required
by
Mitigation
Measure
4.N-13.
Approval
of
TDM
program(s)
meeting
City
and
C/CAG
requirements
prior
to
issuance
of
occupancy
permits.
(ii)
(iii)
Provide
and
maintain
showers
and
changing
facilities
for
employees
in
buildings
having
a
gross
leasable
area
of
25,000
square
feet
or
more;
(iv)
Provide
information
on
transportation
alternatives
to
employees
as
a
condition
of
occupancy
permit/tenancy
contract;
(v)
Establish
a
dedicated
employee
transportation
coordinator
for
each
site-specific
development
as
a
condition
of
occupancy
permit/tenancy
contract;
Approval
of
site-specific
developments
with
conditions
of
approval
requiring
implementation
of
provisions
vii
through
xiii
of
The
Community
Mitigation
Measure
4.B-4
to
Development
Director
shall
be
included
into
all
prepare
a
condition
of
commercial
leases
and
approval
for
site-specific
CC&Rs.
development
that
provisions
vii
through
xiii
of
Mitigation
Measure
4.B-4
shall
be
included
into
all
commercial
leases
and
CC&Rs.
Brisbane
Baylands
Final
EIR
4-14
May
2015