4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Aesthetics
and
Visual
Resources
(cont.)
-
Safety:
The
level
of
comfort
and
security
needed
to
be
provided;
-
Aesthetics:
The
overall
appearance
of
proposed
lighting
with
respect
to
the
Baylands
and
surrounding
community;
and
-
Impacts:
The
extent
to
which
proposed
lighting
minimizes
impacts
on
adjacent
land
uses,
maintains
the
area’s
dark
night
sky,
and
conserves
energy.
Daytime
glare
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
4.A-4b:
All
building
exteriors
within
the
Baylands
Project
Site
shall
be
composed
of
textured
and
other
non-reflective
materials,
including
high-performance
tinted
non-mirrored
glass.
Any
reflective
materials
on
building
exteriors
that
have
a
light
reflectivity
factor
greater
than
30
percent
shall
be
positioned
so
as
to
not
reflect
daytime
glare
onto
the
101
freeway
or
onto
existing
residential
communities
in
Brisbane
and
Visitacion
Valley.
Mirrored
glass
shall
be
prohibited.
Applicants
for
specific
plan(s)
shall
include
development
requirements
incorporating
the
performance
standards
set
forth
in
Mitigation
Measure
4.A-4b.
Applicants
for
site-specific
development
shall
design
their
projects
in
compliance
with
the
performance
standards
set
forth
in
Mitigation
Measure
4.A-4b.
Specific
Plans:
City
Council
Site-specific
developments:
City
approval
authority
The
City
shall
not
adopt
any
specific
plan
or
approve
any
site-specific
development
project
that
does
not
meet
the
requirements
of
Mitigation
Measure
4.A-4b.
The
Community
Development
Department
shall
review
specific
plan(s)
prior
to
public
hearings
and
review
site-
specific
development
permits
prior
to
public
hearings
or
approval
if
no
hearing
is
required
for
compliance
with
Mitigation
Measure
4.A-4b.
Adoption
of
specific
plan(s)
with
required
language.
Site-specific
development
project
review
for
compliance
with
Mitigation
Measure
4.A-4b.
Air
Quality
Dust
generation
during
construction
DSP,
DSP-V,
CPP,
&
CPP-V
scenarios
Mitigation
Measure
4.B-1:
To
reduce
fugitive
dust
emissions,
the
following
provisions
shall
be
incorporated
into
construction
specifications
for
all
site-specific
development
projects
within
the
Project
Site.
These
measures
would
reduce
fugitive
dust
emissions
primarily
during
soil
movement,
grading
and
demolition
activities
but
also
during
vehicle
and
equipment
movement
on
unpaved
project
sites.
Basic
Controls
that
Apply
to
All
Construction
Sites
1.
All
exposed
surfaces
(e.g.,
parking
areas,
staging
areas,
soil
piles,
graded
areas,
and
unpaved
access
roads)
shall
be
watered
as
needed,
but
no
less
than
two
times
per
day
on
days
with
no
precipitation.
Construction
contractors
for
site-specific
development
The
City
Building
Official
shall
not
approve
any
building
permit
applications
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
The
City
Engineer
shall
not
approve
any
grading
permit
or
infrastructure
improvements
plan
without
evidence
that
the
required
language
is
included
in
construction
contracts
and
specifications.
The
City
Building
Official
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
building
construction.
The
City
Engineer
shall
be
responsible
for
monitoring
compliance
on
a
minimum
monthly
basis
during
grading
and
infrastructure
construction.
Approval
of
grading,
building,
and
construction
permits
in
compliance
with
Mitigation
Measure
4.B-1.
Brisbane
Baylands
Final
EIR
4-11
May
2015