4.
Mitigation
Monitoring
and
Reporting
Program
Mitigation
Monitoring
and
Reporting
Matrix
(continued)
Significant
Impact
Being
Mitigated
Mitigation
Measure
Responsibility
for
Implementation
Enforcement
Responsibility
Monitoring
Responsibility/
Frequency
Actions
Indicating
Compliance
Aesthetics
and
Visual
Resources
(cont.)
downward
and
away
from
adjacent
streets
and
buildings
in
a
manner
designed
to
minimize
offsite
light
spillage.
A
master
plan
for
street
and
parking
lot
lighting
shall
be
approved
by
the
City
prior
to
final
approval
of
design
plans
for
roadways
within
the
Brisbane
portion
of
the
Project
Site.
-
All
streets
within
the
Brisbane
portion
of
the
Project
Site
shall
have
uniform
lighting
standards
with
regard
to
style,
colors,
and
materials
in
order
to
ensure
consistency
with
design.
-
Parking
lot
lighting
shall
be
of
the
same
source
of
illumination
as
street
lighting
so
as
to
ensure
uniformity
of
night
lighting
color.
-
Due
to
their
high-energy
efficiency,
long
life,
and
spectral
characteristics,
Narrow-Spectrum
Amber
LEDs
shall
be
the
preferred
illumination
source
throughout
the
Brisbane
portion
of
the
Project
Site.
A
photometric
analysis
and
lighting
plan
shall
be
prepared
for
each
development
project.
The
photometric
analysis
shall
include
an
assessment
of
potential
lighting
impacts
based
on
the
height,
location,
light
fixtures,
direction,
illumination
intensity,
and
hours
of
operation.
This
analysis
shall
identify
any
potential
light
spill
beyond
the
boundary
of
the
specific
plan,
as
well
as
light
spill
beyond
the
boundaries
of
individual
sites
within
the
Project
Site
Lighting
performance
standards
as
described
above
shall
apply.
The
lighting
plan
shall
demonstrate
maintenance,
to
the
maximum
extent
feasible,
of
ambient
light
levels
as
measured
from
100
feet
from
the
individual
site.
The
lighting
plan
shall
be
submitted
to
the
Community
Development
Department
and
City
Engineer
for
final
approval
prior
to
approval
of
a
building
permit.
When
reviewing
illumination
plans,
the
City
will
review
the
following
factors
to
determine
the
level
of
illumination
required.
-
Purpose:
The
function
and
activities
for
the
planned
area;
Brisbane
Baylands
Final
EIR
4-10
May
2015
Previous Next