3.
Revisions
to
the
Text
of
the
Draft
EIR
modifications
to
the
tunnel
Tunnel
Avenue
to
provide
additional
lanes
and
modify
signal
timing
to
improve
intersection
operations
to
achieve,
at
a
minimum,
LOS
C
during
both
AM
and
PM
peak
hours
under
the
DSP
and
DSP-V
scenarios
and
ensure
that
LOS
remains
at
LOS
D
or
better
under
the
CPP
and
CPP-V
scenarios.
Page
4.N-99
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-1c
as
follows:
Mitigation
Measure
4.N-1c:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
within
the
Project
Site
other
than
relocation
or
improvement
of
an
existing
use,
The
following
physical
improvements
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
tThe
intersection
of
Alana
Way/Beatty
AvenueRoad/US
101
Southbound
Ramps
shall
be
signalized
and
longer
green
time
shall
be
allowed
for
the
eastbound/westbound
traffic
than
for
the
northbound/southbound
traffic.
In
addition,
the
southbound
(Alana
Way)
approach
shall
be
restriped
to
provide
an
additional
exclusive
right-turn
pocket,
and
the
westbound
(off-ramp)
approach
shall
be
restriped
to
provide
an
additional
through
lane
to
increase
the
capacity
at
the
off-ramp.
Page
4.N-100
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-1d
as
follows:
Mitigation
Measure
4.N-1d:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
within
the
Project
Site
other
than
relocation
or
improvement
of
an
existing
use,
The
following
physical
improvements
shall,
to
the
extent
permitted
by
agencies
with
jurisdiction
over
this
intersection,
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
tThe
eastbound
approach
to
the
Alana
Way/Harney
Way/Thomas
Mellon
Drive
intersection
shall
be
restriped
to
provide
an
additional
right-turn
lane.
Harney
Way
shall
be
widened
to
the
south
of
its
existing
alignment
to
accommodate
this
change.
Page
4.N-101
[See
page
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-1e
as
follows:
Mitigation
Measure
4.N-1e:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
within
the
Project
Site
other
than
relocation
or
improvement
of
an
existing
use,
The
following
physical
improvements
shall,
to
the
extent
permitted
by
agencies
with
jurisdiction
Brisbane
Baylands
Final
EIR
3-128
May
2015