transportation
impacts
associated
with
possible
sold-out
events
occurring
at
the
arena.
Although
no
specific
program
has
been
developed
for
events
at
the
arena
Of
the
up
to
150
events
that
could
occur
at
the
arena,
it
is
unknown
how
many
sell-out
events
with
17,000
attendees
would
occuring
during
weekday
evenings
would
likely
be
infrequent.
Page
4.N-91
BCC-648
[See
page
5-277
for
the
original
comment]
REVISE
footnote
15
as
follows:
The
analysis
of
Existing
plus
Project
conditions
assumes
typical
traffic
conditions
(i.e.,
not
those
conditions
when
the
proposed
arena
under
the
DSP-V
scenario
would
have
a
weekday
evening
sell-out
event).
Traffic
impacts
resulting
from
an
infrequent
occurrence
of
a
weekday
evening
special
event
at
the
arena
are
described
separately
in
Impact
4.N-5.
Page
4.N-96
BCC-662
[See
page
5-280
for
the
original
comment]
REVISE
Mitigation
Measure
4.N-1a
as
follows:
Mitigation
Measure
4.N-1a:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
within
the
Project
Site
other
than
relocation
or
improvement
of
an
existing
use,
The
following
physical
improvements
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
occupancy
of
any
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
tThe
eastbound
approach
on
Geneva
Avenue
to
Bayshore
Boulevard
shall
be
restriped
to
create
one
additional
through
lane.
One
of
the
existing
two
right-turn
lanes
shall
also
be
modified
to
become
a
shared
through/right-turn
lane.
In
addition,
existing
AM
signal
timing
setting
shall
be
modified
by
shifting
8
seconds
of
green
time
from
the
protected
eastbound
left
and
westbound
left
phases
to
the
protected
southbound
left
and
southbound
through
phases.
For
the
PM
signal
timing
settings,
6
seconds
of
green
time
shall
be
shifted
from
the
protected
eastbound
left
and
westbound
left
phases
to
the
protected
northbound
left
and
southbound
left
phases.
Page
4.N-98
BCC-662
[See
page
5-280
for
the
original
comment]
Mitigation
Measure
4.N-
1b
on
page
4.N-98
is
revised
to
read
as
follows:
Mitigation
Measure
4.N-1b:
Prior
to
issuance
of
the
first
building
occupancy
permit
for
new
development
within
the
Project
Site
other
than
relocation
or
improvement
of
an
existing
use,
The
following
physical
improvements
shall
be
constructed
and
accepted
for
public
maintenance
prior
to
issuance
of
occupancy
permits
for
any
site-specific
development
that
would
(1)
result
in
reducing
the
intersection
to
below
the
acceptable
LOS
standard,
or
(2)
contribute
additional
traffic
to
the
intersection
if
it
is
already
operating
below
the
acceptable
LOS
standard.
tThe
intersection
of
Bayshore
Boulevard
and
Old
County
Road
shall
be
improved,
including
Brisbane
Baylands