Construction
Practices
to
Address
Construction
Vibration
and
Potential
Effects
on
Historic
Buildings
Adjacent
to
Transportation
Projects
(Wilson
Ihrig,
2012)
.
This
document
outlines
a
recommended
approach
for
addressing
and
mitigating
potential
vibration
impacts
to
historic
structures.
The
first
four
of
these
measures
were
conducted
as
part
of
the
Draft
EIR
in
Impact
4.J-2,
while
the
following
three
measures
were
identified
as
part
of
the
pre-construction
assessment
identified
in
Mitigation
Measure
4.J-2b.
The
remaining
measures
(below)
are
added
as
elements
to
be
considered
in
the
Pre-construction
assessment
identified
in
Mitigation
Measure
4.J-2b
of
the
Draft
EIR.
Mitigation
Measure
4.J-2b
is
revised
to
read
as
follows.
Mitigation
Measure
4.J-2b:
Pre-Construction
Assessment
to
Minimize
Structural
Pile-Driving
Vibration
Impacts
on
Adjacent
Historic
Buildings
and
Structures
and
Vibration
Monitoring.
Any
development
within
85
feet
of
the
Roundhouse
that
would
require
pile
driving
or
other
construction
techniques
that
could
result
in
vibrations
of
0.25
in/sec
shall
engage
a
qualified
geotechnical
engineer
subject
to
City
approval
to
conduct
a
pre-construction
assessment
of
existing
subsurface
conditions
and
the
structural
integrity
of
the
nearby
historic
structures
subject
to
pile-driving
or
other
vibration-inducing
activity
before
a
building
permit
is
issued
to
demonstrate
that
the
proposed
construction
activities
would
not
result
in
vibration-induced
damage
to
the
Roundhouse
building.
If
recommended
by
the
pre-construction
assessment,
groundborne
vibration
monitoring
of
nearby
historic
structures
shall
be
required.
Such
methods
and
technologies
shall
be
based
on
the
specific
conditions
at
the
construction
site
such
as,
but
not
limited
to,
the
pre-construction
surveying
of
potentially
affected
historic
structures
and
underpinning
of
foundations
of
potentially
affected
structures,
as
necessary.
The
pre-construction
assessment
shall
include
a
monitoring
program
to
detect
ground
settlement
or
lateral
movement
of
structures
in
the
vicinity
of
pile-driving
activities.
Monitoring
shall
be
maintained
while
construction
occurs
within
85
feet
of
historic
structures,
and
results
shall
be
submitted
to
the
City
Engineer.
In
the
event
of
unacceptable
ground
with
the
potential
to
cause
structural
damage
movement
(in
excess
of
0.25
in/sec
PPV
at
historic
structures),
as
determined
by
the
City
Engineer,
all
impact
work
shall
cease
until
corrective
measures
(e.g.,
installation
of
vibration
wave
barriers)
are
implemented
to
reduce
ground
movement
to
below
0.25
inches
PPV.
In
addition,
the
following
measure
shall
be
implemented:
Evaluate
and
implement
feasible
measures
for
reducing
vibration,
such
as
alternative
pile
driving
methods
(e.g.,
cast
‐
in
‐
drilled
‐
hole
Brisbane
Baylands
Final
EIR
2.9.2-121
May
2015