3.
Revisions
to
the
Text
of
the
Draft
EIR
permit,
such
as
treatment
of
the
flows
prior
to
discharge,
depending
on
the
particular
site
conditions.
Discharge
of
the
groundwater
generated
during
dewatering
to
the
sanitary
sewer
or
storm
drain
system
shall
only
occur
with
authorization
of
and
required
permits
from
the
applicable
regulatory
agencies,
including
the
Bayshore
Sanitary
District
or
the
RWQCB.
Site
dewatering
activities
shall
also
be
monitored
by
a
state
licensed
geotechnical
engineer
in
such
a
manner
as
to
avoid
the
potential
for
damaging
buildings
or
infrastructure
due
to
potential
subsidence
of
the
ground
surface
in
accordance
with
any
requirements
from
the
City
Engineer.
Page
4.H-25
UPC
2-13
[See
page
5-532
for
the
original
comment]
REVISE
Mitigation
4.H-
1c
as
follows.
Mitigation
Measure
4.H-1c
.
Applicants
for
site-specific
development
projects
to
be
constructed
within
the
Baylands
Project
Site
shall
prepare
and
implement
a
Final
Stormwater
Management
Plan
(SMP)
in
accordance
with
the
most
recent
NPDES
C.3
requirements
to
be
reviewed
and
approved
by
the
City
Engineer
prior
to
approval
of
final
design
plans.
The
SMP
shall
be
prepared
by
licensed
professionals
and
act
as
the
guiding
document
detailing
best
management
practices
for
mitigating
water
quality
impacts
in
the
post-construction
phase.
Industrial
uses
shall
prepare
a
SMP
in
accordance
with
NPDES
permit
requirements
for
Industrial
Activity.
Industrial
applicants
shall
include
management
measures
that
will
achieve
the
performance
standard
of
best
available
technology
economically
achievable
and
best
conventional
pollutant
control
technology
in
accordance
with
the
General
Industrial
Permit
as
approved
by
the
RWQCB
and
shall
demonstrate
compliance
within
an
annual
report
be
submitted
each
July
1.
The
SMP
shall
provide
operations
and
maintenance
guidelines
for
all
of
the
BMPs
identified
in
the
SMP,
including
LID
measures
and
other
BMPs
designed
to
mitigate
potential
water
quality
degradation
of
runoff
from
all
portions
of
the
completed
development,
and
shall
clearly
identify
the
funding
sources
entity
responsible
for
the
required
ongoing
maintenance.
The
SMP
shall
be
developed
in
conjunction
with
the
Storm
Drain
Master
Plan
to
ensure
that
the
treatment
designs
support
the
hydraulics
and
hydrology
of
the
proposed
storm
drainage
system.
Page
4.H-30
BBCAG-315
[See
page
5-152
for
the
original
comment]
REVISE
Mitigation
Measure
4.H-4a
as
follows.
Mitigation
Measure
4.H-4a:
Prior
to
issuance
of
a
building
permit,
all
site-specific
development
plans
within
the
Project
Site
shall
include
systemwide
drainage
improvements
that
shall
accommodate
all
increased
runoff
in
accordance
with
City
requirements
and
correct
known
existing
deficiencies
(e.g.,
Levinson
Overflow
Area
and
the
PG&E
property).
On-
site
storm
drainage
collection
facilities
shall
be
sized
to
convey
the
peak
flow
rate
from
a
25-year
storm
event
entirely
within
the
piping
system
such
that
Baylands
roadways
and
recreational
facilities
are
not
flooded.
Drainage
improvements
shall
accommodate
the
100-year
peak
storm
event
Brisbane
Baylands
Final
EIR
3-95
May
2015
Previous Next